CONTRATO No :117 DEL 2006 ACTA DE MODIFICACION DE OBRA No. 04 ACTA DE MODIFICACION DE OBRA No. 05OBJETO: EL CONTRATISTA SE OBLIGA PARA CON EL MUNICIPIO A REALIZAR POR EL SISTEMA DE PRECIOS UNITARIOS SIN FORMULA DE REAJUSTE LA CONSTRUCCION SEGUNDA ETAPA SEDE COLEGIO SAN AGUSTIN DEL MUNICIPIO DE AGUAZUL, DEPARTAMENTO DE CASANARE.CONTRATISTA: INTERVENTOR: REPUBLICA DE COLOMBIA DEPARTAMENTO DE CASANARE MUNICIPIO DE AGUAZUL FECHA DE INICIACION: PLAZO INICIAL PLAZO ADICIONAL FECHA DE TERMINACION: VALOR INICIAL : VALOR ADICIN: VALOR TOTAL:UNION TEMPORAL SAN AGUSTIN SERIARQ LTDA. FECHA : 2 de August de 2006 UN( 01) AO CUATRO (4) MESES 5 DE JUNIO DE 2008 $ 1,799,865,952.00 $ 849,063,560.00 $ 2,648,929,512.00 VALOR TOTAL ACTA DE MODIFICACION 04: VALOR TOTAL ACTA DE MODIFICACION 05: 21 DE DICIEMBRE DE 2007 FECHA : 23 DE SEPTIEMBRE DE 2008$ 2,648,929,512$ 2,648,929,512CONDICIONES ORIGINALES ITEM 1 2 2.1 2.2 3 3.1 3.2 3.3 3.4 3.5 3.6 3.7 4 4.1 4.2 5 5.4 5.5 6 6.1 6.2 6.3 6.6 7 7.1 7.2 8 8.1 8.2 8.3 10 10.9 11 11.1 11.2 PRELIMINARES MOVIMIENTO DE TIERRAS Excavacin manual y retiro de material comn Relleno material seleccionado de la excavacin ESTRUCTURA EN CONCRETO Solado en concreto de 3000 PSI e= 0,05 m para zapatas Concreto de 3000 psi para zapatas Concreto de 3000 psi para pedestales Concreto de 3000 psi para vigas de cimentacin Concreto de 3000 psi para columnas Estructura de escalera en concreto de 3000 psi y acero de refruerzo de 60,0000 psi acero de refuerzo de 60.000 psi ESTRUCTURA METLICA DE CUBIERTA Suministro e instalacion de lamina termo acustica monolitica, Incluye los anclajes necesarios para fijar a la correa. TEMPLETE en varilla lisa de 1/2" con extremos roscados. MAMPOSTERIA Muro en bloque No. 5. Primer nivel Muro en bloque No. 5. Segundo nivel PAETE Y ESTUCO Paete en mortero 1:5, e= 1,5 cm. pulido para muros 1er piso Paete en mortero 1:5, e= 1,5 cm. pulido para muros 2do piso Paete liso en mortero 1:4, e= 2,0 cm. pulido con cal para tableros Paete en morteron 1:4 e=1,5 cm. pulido para columnas,losa y vigas. PINTURA Pintura en vinilo tipo 1, incluye lineales Pintura en esmalte mate para tableros PISO Y ENCHAPE Plantilla de nivelacin de pisos e=3cms Suministro e instalacin de cermica trafico 5 para pisos, formato 30x30 Suministro e instalacin de guarda escoba en ceramica. CARPINTERIA Pasamanos escalera y rampa tubera galvanizada D= 1 1/2" INSTALACIONES HIDROSANITARIAS Construccin caja de inspeccin de 0,6x0,6 en mampostera y concreto Suministro e instalacin tubera pvc sanitaria 4" UN ML 6.00 20.00 $ 146,412.50 $ 52,849.69 $ 878,475.00 $ 1,056,993.75 6.00 20.00 $ 146,412.50 $ 52,849.69 $ 878,475.00 $ 1,056,993.75 ML 25.00 $ 102,745.84 $ 2,568,645.94 25.00 $ 102,745.84 $ 2,568,645.94 M2 M2 ML 2,648.31 2,669.23 1,034.20 $ 18,583.91 $ 66,193.75 $ 24,835.63 $ 49,215,961.31 $ 176,686,343.31 $ 25,685,003.38 2,648.31 2,669.23 1,034.20 $ 18,583.91 $ 66,193.75 $ 24,835.63 $ 49,215,961.31 $ 176,686,343.31 $ 25,685,003.38 M2 M2 3,335.76 57.60 $ 7,787.50 $ 16,189.29 $ 25,977,231.00 $ 932,502.96 3,335.76 57.60 $ 7,787.50 $ 16,189.29 $ 25,977,231.00 $ 932,502.96 M2 M2 M2 ML 2,137.30 1,085.16 57.60 $ 13,335.00 $ 15,748.13 $ 16,085.00 $ 9,247.50 $ 28,500,895.50 $ 17,089,235.33 $ 926,496.00 $2,137.30 1,085.16 57.60 0.00 $ 13,335.00 $ 15,748.13 $ 16,085.00 $ 9,247.50 $ 28,500,895.50 $ 17,089,235.33 $ 926,496.00 $M2 M2 1,082.67 422.40 $ 33,692.68 $ 37,871.24 $ 36,478,048.44 $ 12,797,448.58 1,082.67 422.40 $ 33,692.68 $ 37,871.24 $ 36,478,048.44 $ 15,996,810.72 M2 ML 1,775.37 184.00 $ 101,150.79 $ 17,700.00 $ 143,664,058.88 1,775.37 184.00 $ 101,150.79 $ 17,700.00 $ 179,580,073.60 $ 3,256,800.00 M2 M3 M3 M3 M3 UN KG 271.06 96.16 14.76 17.57 30.61 1.00 21,125.29 M3 M3 348.93 673.50 $ 31,200.00 $ 35,200.00 $$ 17,970.49 $ 462,485.80 $ 462,485.80 $ 462,485.80 $ 741,165.86 $ 2,431,121.88 $ 4,056.25 $ 4,871,080.34 $ 44,472,634.53 $ 6,826,290.41 $ 8,125,875.51 $ 22,687,087.05 $ 2,431,121.88 $ 85,689,457.56 271.06 96.16 14.76 17.57 30.61 1.00 21,125.29 $ 17,970.49 $ 462,485.80 $ 462,485.80 $ 462,485.80 $$ 2,431,121.88 $ 4,056.25 $ 4,871,080.34 $ 44,472,634.53 $ 6,826,290.41 $ 8,125,875.51 $ 22,687,087.05 $ 2,431,121.88 $ 85,689,457.56 $ 10,886,616.00 $ 23,707,200.00 348.93 673.50 $ 31,200.00 $ 35,200.00 $ 10,886,616.00 $ 23,707,200.00 DESCRIPCION UND CANT. P/UNITARIO VALOR CANT. P/UNITARIO VALORCONDICION ACTUALIZADA SEGN MODIFICACION 04 CANT. VALORMODIFICACION 05CONDICION ACTUALIZADA SEGN MODIFICACION 05 CANT. VALORCANT. (+/-)VALOR$ 36,916,168.00 699.47 428.770 $ 21,823,464.00 $ 15,092,704.00 $ 481,552,426.33 195.74 60.47 9.19 38.04 122.05 2.00 82,071.772 $ 3,517,543.22 $ 27,966,516.33 $ 4,250,244.50 $ 17,592,959.83 $ 90,459,293.52 $ 4,862,243.75 $ 332,903,625.18 $ 236,622,879.50 2,200.00 796.11 $ 222,531,732.50 $ 14,091,147.00 $ 14,732,576.15 395.00 37.60 $ 13,308,606.63 $ 1,423,969.53 $ 31,222,470.08 408.63 212.68 0.00 2,424.88 $ 5,449,081.05 $ 3,349,311.23 $$ 22,424,077.80 $0.00 0.00 $$$ 108,526,315.17 3,452.9272 670.11 0.00 $ 64,168,896.18 $ 44,357,418.98 $$0.00 $$ 19,806,060.97 9.00 113.40 $ 1,317,712.50 $ 5,993,154.56 -3.00 -29.00 $ -439,237.50 $ -1,532,640.94 $-215.76 -670.11 $ -4,009,664.96 $ -44,357,093.81 $$$-381.18 -23.94 -18.66 $ -319,239.90 $ -293,860.01 $$ -3,524,962.05 384.69 194.02 0.00 2,043.70 0.00 0.00 0.00 0.00 3,237.17 0.00 0.00 0.00 0.00 0.00 6.00 84.40 -287.21 -3.90 $ -9,676,873.19 $ -147,697.83 107.79 33.70 371.17 0.00 $ 37,544,137.80 $2,571.17 796.11 3,196.40 1.73 2.50 $$$ 1,156,214.50 $$ 1,282,216.94 $$ 12,965,397.50 195.74 60.47 11.69 38.04 123.78 2.00 85,268.17 169.39 66.82 $ 5,284,968.00 $ 2,352,064.00 868.86 495.59$ 44,553,200.00 $ 27,108,432.00 $ 17,444,768.00 $ 496,956,247.15 $ 3,517,543.22 $ 27,966,516.33 $ 5,406,459.00 $ 17,592,959.83 $ 91,741,510.46 $ 4,862,243.75 $ 345,869,014.56 $ 274,167,017.30 $ 260,075,870.30 $ 14,091,147.00 $ 4,907,994.14 $ 3,631,733.44 $ 1,276,260.70 $ 27,084,408.11 $ 5,129,841.15 $ 3,055,451.21 $$ 18,899,115.75 $$$$ 60,159,284.03 $ 60,159,284.03 $$$$$ 15,849,898.74 $ 878,475.00 $ 4,460,513.6311.3 11.4 11.5 11.6 11.7 11.8 11.9Suministro e instalacin tubera pvc sanitaria 3" Suministro e instalacin tubera pvc sanitaria 2" Punto hidrulico 1/2" Punto sanitario 2" Punto sanitario 3" Suministro e instalacin tubera pvc hidrulica 1" RDE 21 Suministro e instalacin tubera pvc hidrulica " RDE 21ML ML UN UN UN ML ML UN36.00 12.80 16.00 16.00 4.00 24.00 44.00 4.00$ 41,806.88 $ 27,489.38 $ 35,231.25 $ 62,834.29 $ 74,159.29 $ 15,626.25 $ 13,001.25 $ 18,918.75$ 1,505,047.50 $ 351,864.00 $ 563,700.00 $ 1,005,348.57 $ 296,637.14 $ 375,030.00 $ 572,055.00 $ 75,675.0036.00 12.80 16.00 16.00 4.00 24.00 44.00 4.00$ 41,806.88 $ 27,489.38 $ 35,231.25 $ 62,834.29 $ 74,159.29 $ 15,626.25 $ 13,001.25 $ 18,918.75$ 1,505,047.50 $ 351,864.00 $ 563,700.00 $ 1,005,348.57 $ 296,637.14 $ 375,030.00 $ 572,055.00 $ 75,675.0080.00 118.80 55.00 35.00 8.00 15.50 60.00 7.00$ 3,344,550.00 $ 3,265,737.75 $ 1,937,718.75 $ 2,199,200.00 $ 593,274.29 $ 242,206.88 $ 780,075.00 $ 132,431.25 $ 50,997,768.88-33.10$ -1,383,807.56 $$$$$-46.90 118.80 55.00 35.00 8.00 15.50 24.00 0.00 0.00$ 1,960,742.44 $ 3,265,737.75 $ 1,937,718.75 $ 2,199,200.00 $ 593,274.29 $ 242,206.88 $ 312,030.00 $$ 27,549,362.51 $ 12,725,268.75 $ 11,092,778.13 $$$$$$$ 3,731,315.63 $$$$$$$$$$$$$$$$ 780,208.34 $ 780,208.34 $ 8,231,700.00 $ 8,231,700.00 $ 42,140,840.61 $ 1,242,782.40 $ 22,689,673.32 $ 18,208,384.89 $ 545,707,364.10 $ 3,993,100.68 $ 331,178,957.56 $ 13,192,752.35 $ 3,337,902.51 $ 98,574,170.04-36.00 -7.00$ -468,045.00 $ -132,431.2511.10 Suministro e instalacin de rejillas de piso 3" 12 12.1 12.2 12.3 12.4 12.5 12.6 12.7 12.8 12.9 INSTALACIONES ELECTRICAS, DATOS Y AIRE ACONDICIONADO Punto para lmparas y ventiladores Punto para tomacorriente Punto para tomacorriente con polo a tierra Lmparas fluorescentes de 2" x 48" Suministro e instalacin de ventiladores Suministro e instalacin de breakers de 15 20 A Suministro e instalacin de Interruptor termo magntico 3 polos x 30 Amps. Suministro e instalacin de extractores de aire Suministro e instalacin de tablero trifsico 12 circuitos con puerta y llaveUN UN UN UN UN UN UN UN UN UN UN329.00 24.00 54.00 216.00 98.00 68.00 4.00 4.00 2.00 5.00 11.00 11.00 125.00 1.00$ 78,551.04 $ 77,571.88 $ 75,459.38 $ 99,217.32 $ 339,988.54 $ 22,965.23 $ 281,160.94 $ 307,488.54 $ 414,590.63 $ 454,465.63 $ 63,466.41 $ 173,357.81 $ 35,757.81 $ 256,160.94 $ 354,943.75$ 25,843,292.71 $ 1,861,725.00 $ 4,074,806.25 $ 21,430,940.63 $ 33,318,877.08 $ 1,561,635.94 $ 1,124,643.75 $ 1,229,954.15 $ 829,181.25329.00 24.00 54.00 216.00 98.00 68.00 4.00 4.00 2.00 5.00$ 78,551.04 $ 77,571.88 $ 75,459.38 $ 99,217.32 $ 339,988.54 $ 22,965.23 $ 281,160.94 $ 307,488.54 $ 414,590.63 $ 454,465.63 $ 63,466.41 $ 173,357.81 $ 35,757.81 $ 256,160.94 $ 354,943.75 $ 24,808.75 $ 9,855,425.00 $ 258,709.38 $ 68,289.59 $ 103,196.88 $ 54,228.75 $ 281,160.94$ 25,843,292.71 $ 1,861,725.00 $ 4,074,806.25 $ 21,430,940.63 $ 33,318,877.08 $ 1,561,635.94 $ 1,124,643.75 $ 1,229,954.15 $ 829,181.25 $ 2,272,328.13 $ 698,130.47 $ 1,906,935.94 $ 4,469,726.56 $ 256,160.94 $$ 7,467,433.75 $ 29,566,275.00 $ 517,418.75 $ 3,960,796.08 $ 825,575.00 $ 3,796,012.50 $ 281,160.94329.00 195.00 0.00 0.00 0.00 45.00 1.00 0.00 9.00 0.00 0.00 0.00 125.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ 25,843,292.71 $ 15,126,515.63 $$$$ 1,033,435.55 $ 281,160.94 $$ 3,731,315.63 $$$$ 4,469,726.56 $ 512,321.88 $$$$$$$$$--167.00 -52.00$ -13,118,023.96 $ -4,033,737.50 $$$-162.00 143.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00-45.00 -1.00$ -1,033,435.55 $ -281,160.94 $$$$$-12.10 Suministro e instalacin de luminarias de Sodio 70W con soporte vertical, certificada. 12.11 Suministro e instalacin de pedestal en concreto para base ornamental$ 698,130.47 $ 1,906,935.94 $ 4,469,726.56 $ 256,160.9411.00 11.00 125.00 1.00 0.0012.12 Suministro e instalacin base ornamental con tubo galvanizado en caliente tipo pesado de 2"x6 m pintado con white primer, anticorrosivo y anoloc.UN 12.13 Suministro e instalacin de acometida en alambre de cobre 3xNo.10 THHN +1xNo.10 THHN + Alambre 1xNo.10 TW, en tubera PVC 3/4" 12.14 Suministro e instalacin de interruptor termo magntico 3x30 Amperios 12.15 Suministro e instalacin Lmpara de emergencia para 165 lmenes, 3 horas autonoma. 12.16 Suministro e instalacin de cableado estructurado en interiores 12.17 Suministro e instalacin de sistema de aire acondicionado de 5 TR, 3 ph, tipo split. 12.18 Suministro e instalacin de rejilla de retorno 20"x20" para sistema de aire acondicionado 12.19 Suministro e instalacin de Ductera de suministro en fibra de vidrio para sistema de aire acondicionado 12.20 Suministro e instalacin de rejilla multidireccional con damper aleta mvil de 10"x10" para sistema de aire acondicionado 12.21 Suministro e instalacin de acometida en cable de cobre 3xNo.6 THHN +1xNo.6 THHN + Alambre 1xNo.10 TW, en tubera PVC 1" 12.22 Suministro e instalacin de Interruptor termomagntico 3 polos x 60 Amps. 13 13.1 14 14.1 1 1.1 2 2.3 2.4 2.5 3 3.8 3.9 3.10 3.11 3.12 ANDENES Plantilla en concreto de 3000 psi e= 5 cm LIMPIEZA Limpieza general de muros, pisos y retiro de escombros ITEMS NO PREVISTOS PRELIMINARES Localizacin y replanteo comision topografica ITEMS NO PREVISTOS MOVIMIENTO DE TIERRAS Excavacin mecnica Subbase triturada de D = 1 1/2" Relleno con material comn de prstamo ITEMS NO PREVISTOS ESTRUCTURA EN CONCRETO Solado en concreto para vigas de amarre a=0.25 e=0.05 Concreto de 3000 psi para placa aligerada de entrepiso, incluye vigas y viguetas. e=35 cm Concreto de 3000 psi para rampa Concreto vigade confinamiento patio interior(0,20*0,15). Incluye refuerzo Placa en concreto de 3000 psi e=10 cm. Nivel 0,0 ML M2 M3 ML M2 M3 M3 M3 M2 GL M2 ML UN UN MI UN UN M2 UN ML UN-125.00 -2.00$ -4,469,726.56 $ -512,321.88 $$$$$$$$-301.00 3.00 2.00 58.00 8.00 70.00 1.00$ 24,808.75 $ 9,855,425.00 $ 258,709.38 $ 68,289.59 $ 103,196.88 $ 54,228.75 $ 281,160.94$ 7,467,433.75 $ 29,566,275.00 $ 517,418.75 $ 3,960,796.08 $ 825,575.00 $ 3,796,012.50 $ 281,160.94301.00 3.00 2.00 58.00 8.00 70.00 1.00$ 26,360.41$-0.00$ 26,360.41$-0.00$$ 2,340,625.01$-0.00 0.003.00$ 780,208.34$ 2,340,625.013.00$ 780,208.34$ 2,340,625.013.00$ 2,340,625.01 $ 8,231,700.00-2.00$ -1,560,416.681.00 0.00$ 3,450.00$-0.00$ 3,450.00$-2,386.00$ 8,231,700.00 $ 27,795,304.72$-2,386.00 0.00$ 4,560.00 $ 50,403.58 $ 37,838.75$$$-0.00 0.00 0.00$ 4,560.00 $ 50,403.58 $ 37,838.75$$$-209.02 170.58 482.16$ 953,131.20 $ 8,597,841.82 $ 18,244,331.70 $ 544,997,928.3463.52 279.58 -0.95$ 289,651.20 $ 14,091,831.50 $ -35,946.81272.54 450.16 481.21 0.00$ 6,561.13 $ 194,987.79 $ 741,165.86 $ 37,716.41 $ 52,714.59$$$$$-0.00 0.00 0.00 0.00 0.00$ 6,561.13 $ 194,987.79 $ 741,165.86 $ 37,716.41 $ 52,714.59$$$$$-608.60 1,698.46 17.80 88.33 1,869.46$ 3,993,100.68 $ 331,178,957.56 $ 13,192,752.35 $ 3,331,490.72 $ 98,547,812.75 0.17 0.50$$$$ 6,411.79 $ 26,357.29608.60 1,698.46 17.80 88.50 1,869.963.13 3.14 3.15 3.16 4 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 4.14 5 5.1 5.2 5.3 5.6 5.7 5.8 5.9 5.10 5.11 5.12 5.13 5.14 5.15 6 6.4 6.5 8 8.4 8.5 8.6 8.7 8.8 8.9 9 9.1 9.2 9.3 9.4 9.5Malla electrosoldada 4 mm.M-084. Concreto Ciclopeo. ( 60/40 ) Concreto 3000 p.s.i. Para vigas de amarre y corona segundo piso. Concreto 3000 p.s.i. para viga canal. ( incluye refuerzo ) ITEMS NO PREVISTOS ESTRUCTURA METLICA DE CUBIERTA CERCHA METLICAS. Tubos con elementos diagonales y verticales . SEGN DISEO. VIENTOS EN VARILLA LIZA D=5/8" CON EXTREMOS ROSCADOS PUNTO DE APOYO. PLATINA 250*250*12 mm CON 4 PERFORACIONES DE D=5/8". INCLUYE PERNOS PUNTO DE APOYO. PLATINA 300*300*12 mm CON 4 PERFORACIONES DE D=5/8". INCLUYE PERNOS PUNTO DE APOYO. PLATINA 150*150*12 mm CON 4 PERFORACIONES DE D=5/8". INCLUYE PERNOS PLATINA UNIN CORREA 254 mm - VIGA CORONA 170*80*6 mm. PLATINA UNIN CORREA 125 mm - VIGA CORONA 150*80*6 mm. CARTELA 150*80*3 mm. CARTELA 100*80*3 mm. CANAL DE AGUAS LLUVIAS EN LAMINA GALVANIZADA. CORREAS METLICAS PHR 125*50*1,5mm CORREAS METLICAS PHR 254*63*2mm ITEMS NO PREVISTOS MAMPOSTERIA Mesn loza en concreto acabado en granito pulido.e=7 cm. Alfaja en concreto.(0,25*0,10). Incluye refuerzo Muro en ladrillo rejilla a la vista 1 cara Dintel en concreto,(0,20*0,25).incluye refuerzo Limpieza y lavado de mampostera Inmunizacin mampostera Anclaje muro esbelto hiero 1/2 " Anclaje muro hierro 1/4 " Enchape en ladrillo rejilla a la vista para vigas Enchape en ladrillo rejilla a la vista para vigas con Gotero. Gotero en mortero Alfagia corona. Concreto 3000 p.s.i.incluye refuerzo.(0,07*0,7) Alfagia base de persianas.concreto de 3000 p.s.i. incluye refuerzo.(0,07*0,42) ITEMS NO PREVISTOS PAETE Y ESTUCO Estuco Paete en mortero 1:4 e=1,5 cm para placa de entrepiso ITEMS NO PREVISTOS PISO Y ENCHAPE Suministro e instalacin de tabln de gress para pisos exteriores, formato 20x20. Suministro e instalacin de guarda escoba en gres. Dilatacin en gravilla lavada para pisos exteriores.Hasta 10 cm. Cermica blanca. Enchape pared baos.(23,3*30,5) Cermica granilla negra. Enchape piso baos.(30,5*30,5) Enchape columnas en ladrillo ITEMS NO PREVISTOS APARATOS SANITARIOS suministro e instalacin de sanitario tipo econmico Sanitario minusvalidos Lavamanos de empotrar lnea econmica con grifera tipo push Ducha sencilla Poceta en acero inoxidable 50x60 con pestaa y gritera mezcladoraKG M3 M3 ML$ 5,837.50 $ 291,666.66 $ 772,265.63 $ 492,646.88$$$$-0.00 0.00 0.00 0.00$ 5,837.50 $ 291,666.66 $ 772,265.63 $ 492,646.88$$$$-5,065.21 17.24 40.77 58.20$ 29,568,163.38 $ 5,028,333.26 $ 31,485,269.53 $ 28,672,048.13 $ 264,136,371.00 2.32$$ 676,666.66 $$-5,065.21 19.56 40.77 58.20 0.00$ 29,568,163.38 $ 5,704,999.92 $ 31,485,269.53 $ 28,672,048.13 $ 315,168,019.25 $ 151,681,466.75 $ 3,840,000.00 $ 6,110,160.00 $ 6,625,342.50 $ 9,361,370.00 $ 503,968.75 $ 2,857,140.00 $ 5,037,730.00 $ 5,582,508.75 $ 32,344,882.50 $ 78,584,412.50 $ 12,639,037.50 $ 610,538,525.84 $ 9,005,140.83 $ 10,815,774.86 $ 289,002,163.13 $ 43,987,369.91 $ 65,204,118.75 $ 56,149,992.50 $ 16,821,274.21 $ 57,185,041.64 $ 26,902,196.72 $ 7,781,501.26 $ 1,034,741.47 $ 26,649,210.56 $$ 33,578,554.20 $$ 33,578,554.20 $ 40,428,085.63 $$$$$$ 40,428,085.63 $ 1,110,572.78 $$$$$-KG ML UN UN UN UN UN UN UN ML ML ML$ 12,925.00 $ 20,000.00 $ 145,480.00 $ 157,746.25 $ 126,505.00 $ 20,158.75 $ 19,841.25 $ 6,113.75 $ 5,996.25 $ 123,453.75 $ 42,023.75 $ 46,811.25$$$$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ 12,925.00 $ 20,000.00 $ 145,480.00 $ 157,746.25 $ 126,505.00 $ 20,158.75 $ 19,841.25 $ 6,113.75 $ 5,996.25 $ 123,453.75 $ 42,023.75 $ 46,811.25$$$$$$$$$$$$-7,787.22 192.00 42.00 42.00 74.00 25.00 144.00 824.00 931.00 262.00 1,870.00 270.00$ 100,649,818.50 $ 3,840,000.00 $ 6,110,160.00 $ 6,625,342.50 $ 9,361,370.00 $ 503,968.75 $ 2,857,140.00 $ 5,037,730.00 $ 5,582,508.75 $ 32,344,882.50 $ 78,584,412.50 $ 12,639,037.50 $ 600,432,941.573,948.29$ 51,031,648.25 $$$$$$$$$$$-11,735.51 192.00 42.00 42.00 74.00 25.00 144.00 824.00 931.00 262.00 1,870.00 270.00 0.00M2 ML M2 ML M2 M2 ML PTO ML ML ML ML ML$ 144,174.53 $ 46,229.16 $ 81,412.50 $ 116,365.63 $ 13,575.00 $ 11,690.00 $ 17,357.09 $ 9,087.09 $ 38,953.13 $ 63,413.75 $ 11,879.93 $ 169,956.70 $ 115,696.70$$$$$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ 144,174.53 $ 46,229.16 $ 81,412.50 $ 116,365.63 $ 13,575.00 $ 11,690.00 $ 17,357.09 $ 9,087.09 $ 38,953.13 $ 63,413.75 $ 11,879.93 $ 169,956.70 $ 115,696.70$$$$$$$$$$$$$-87.00 246.66 3,842.1740 266.3250 5,526.707 5,526.707 911.60 1,952.00 551.15 114.19 88.20 130.90 64.80$ 12,543,183.68 $ 11,402,885.22 $ 312,800,990.78 $ 30,991,075.08 $ 75,025,047.53 $ 64,607,204.83 $ 15,822,720.97 $ 17,737,994.80 $ 21,469,014.84 $ 7,241,216.11 $ 1,047,809.39 $ 22,246,652.20 $ 7,497,146.16 $ 31,558,060.20-24.54 -12.70 -292.32 111.68 -723.46 -723.46 57.53 4,341.00 139.48 8.52 -1.10 25.90 -64.80$ -3,538,042.84 $ -587,110.36 $ -23,798,502.00 $ 12,995,713.00 $ -9,820,969.50 $ -8,457,247.40 $ 998,553.24 $ 39,447,046.84 $ 5,433,181.88 $ 540,285.15 $ -13,067.92 $ 4,401,878.53 $ -7,497,146.1662.46 233.96 3,549.85 378.01 4,803.25 4,803.25 969.13 6,293.00 690.63 122.71 87.10 156.80 0.00 0.00M2 M2$ 8,137.50 $ 19,770.00$$-0.00 0.00$ 8,137.50 $ 19,770.00$$-0.00 1,596.26$$ 31,558,060.20 $ 51,790,280.63 102.20$$ 2,020,494.000.00 1,698.46 0.00M2 ML ML M2 M2 ML$ 52,209.56 $ 22,710.63 $ 29,906.25 $ 40,826.84 $ 44,182.06 $ 32,612.50$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00$ 52,209.56 $ 22,710.63 $ 29,906.25 $ 40,826.84 $ 44,182.06 $ 32,612.50$$$$$$-0.00 0.00 0.00 0.00 0.00 1,588.05$$$$$$ 51,790,280.63 $ 4,489,621.25 -348.40$$$$$$ -11,362,195.000.00 0.00 0.00 0.00 0.00 1,239.65 0.00UN UN UN UN UN$ 257,175.00 $ 319,675.00 $ 350,575.00 $ 50,206.25 $ 231,000.00$$$$$-0.00 0.00 0.00 0.00 0.00$ 257,175.00 $ 319,675.00 $ 350,575.00 $ 50,206.25 $ 231,000.00$$$$$-0.00 0.00 0.00 1.00 11.00$$$$ 50,206.25 $ 2,541,000.00 -1.00 -11.00$$$$ -50,206.25 $ -2,541,000.000.00 0.00 0.00 0.00 0.009.6 9.7 10 10.1 10.2 10.3 10.4 10.5 10.6 10.7 10.8Orinal en mampostera y enchapado 7,0*0,5*0,3 m. Suministro e instalacin de espejos claros 4 mm ITEMS NO PREVISTOS CARPINTERIA Suministro e instalacin de puerta metlica en lamina coll rol.interior baos Puerta en madera entamborada doble abra;cerradura convencional; 1,85*2,0; Visor 0,4*0,4 Puerta en madera entamborada doble abra;cerradura convencional; 1,40*2,0; Visor 0,4*0,4 Puerta en madera entamborada doble abra;cerradura convencional ; 2,4*2,0; Puerta en madera entamborada una abra. Cerradura convencional Ventana corrediza en aluminio Anoloc con vidrio Persiana en aluminio fija con vidrio.Altura menor a h= 1,0 m Persiana en aluminio fija con vidrio.Altura mayor o igual a h= 1,0 mUN M2$ 949,207.50 $ 88,156.25$$-0.00 0.00$ 949,207.50 $ 88,156.25$$-2.00 0.00$ 1,898,415.00 $$ 23,947,330.00-0.83$ -787,842.23 $-1.17 0.00 0.00$ 1,110,572.78 $$ 21,567,047.98 $$$$$$$$$ 21,567,047.98 $ 37,239,906.26 $$ 1,334,867.18 $$$ 4,237,553.72 $ 393,445.00 $ 438,290.18 $ 1,491,262.50 $ 1,629,562.50 $ 21,985,189.43 $$ 1,464,747.50 $ 143,370.00 $ 56,070.00 $ 419,850.00 $ 2,703,341.25 $ 349,728.50 $ 592,628.50 $ 41,208,389.56 $$$ 1,952,556.25 $$ 909,466.88 $-UN UN UN UN UN M2 ML M2 ML$ 237,440.63 $ 1,095,459.16 $ 874,050.00 $ 1,079,509.17 $ 345,600.00 $ 287,266.00 $ 272,650.00 $ 285,775.00 $ 206,442.50$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ 237,440.63 $ 1,095,459.16 $ 874,050.00 $ 1,079,509.17 $ 345,600.00 $ 287,266.00 $ 272,650.00 $ 285,775.00 $ 206,442.50$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 116.00$$$$$$$$$ 23,947,330.00 $ 71,892,724.25 -11.53$$$$$$$$$ -2,380,282.030.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 104.47 0.0010.10 Baranda para escalera y rampa en tubera galvanizada D=1 1/2" 11 ITEMS NO PREVISTOS INSTALACIONES HIDROSANITARIAS11.11 Punto hidrulico 3/4" 11.12 Punto sanitario 4" 11.13 Suministro e instalacin rejilla de piso 2" 11.14 Suministro e instalacin rejilla de piso 4" 11.15 Suministro e instalacin tubera pvc sanitaria 6" 11.16 Construccin caja de inspeccin de 0,7*0,7 en mampostera y concreto 11.17 Construccin caja de inspeccin de 0,8*0,8 en mampostera y concreto 11.18 Construccin caja de inspeccin de 1,0*1,0 en mampostera y concreto 11.19 Construccin caja de inspeccin de 1,0*0,5 en mampostera y concreto.(Caja aguas lluvias). 11.20 Suministro e instalacin tubera pvc aguas lluvias 3" 11.21 Suministro e instalacin tubera pvc aguas lluvias 8" 11.22 Suministro e instalacin de rejilla metlica 1 X 0,5 m para cajas de aguas lluvias. 11.23 Suministro e instalacin tubera pvc hidrulica 2" RDE 21 11.24 Suministro e instalacin tubera pvc hidrulica 1-1/4" RDE 21 11.25 Suministro e instalacin tubera pvc hidrulica 3/4" RDE 21 11.26 Suministro e instalacin tubera pvc hidrulica 1/2" RDE 9 11.27 Caja de lavado en mampostera y enchape. 11.28 Caja de lavado taller de ceramica y arte,en mamposteria y enchape.(2,7*0,5) 12 ITEMS NO PREVISTOS INSTALACIONES ELECTRICAS, DATOS Y AIRE ACONDICIONADOUN UN UN UN ML UN UN UN UN ML ML UN ML ML ML ML UN UN$ 40,242.24 $ 74,159.29 $ 17,793.75 $ 21,527.50 $ 63,152.81 $ 196,722.50 $ 219,145.09 $ 248,543.75 $ 162,956.25 $ 26,916.25 $ 73,901.79 $ 146,474.75 $ 23,895.00 $ 16,020.00 $ 13,995.00 $ 15,626.25 $ 174,864.25 $ 296,314.25$$$$$$$$$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ 40,242.24 $ 74,159.29 $ 17,793.75 $ 21,527.50 $ 63,152.81 $ 196,722.50 $ 219,145.09 $ 248,543.75 $ 162,956.25 $ 26,916.25 $ 73,901.79 $ 146,474.75 $ 23,895.00 $ 16,020.00 $ 13,995.00 $ 15,626.25 $ 174,864.25$$$$$$$$$$$$$$$$$-16.00 18.00 9.00 2.00 450.00 2.00 5.00 36.00 10.00 780.00 30.00 10.00 6.00 3.50 30.00 180.00 3.00 2.00$ 643,875.80 $ 1,334,867.18 $ 160,143.75 $ 43,055.00 $ 28,418,765.63 $ 393,445.00 $ 1,095,725.44 $ 8,947,575.00 $ 1,629,562.50 $ 20,994,671.59 $ 2,217,053.63 $ 1,464,747.50 $ 143,370.00 $ 56,070.00 $ 419,850.00 $ 2,812,725.00 $ 524,592.75 $ 592,628.50 $ 36,937,708.85-16.00$ -643,875.80 $-0.00 18.00 0.00 0.00 67.10 2.00 2.00 6.00 10.00 816.80 0.00 10.00 6.00 3.50 30.00 173.00 2.00 2.00 0.00-9.00 -2.00 -382.90$ -160,143.75 $ -43,055.00 $ -24,181,211.91 $--3.00 -30.00$ -657,435.26 $ -7,456,312.50 $-36.80 -30.00$ 990,517.84 $ -2,217,053.63 $$$$--7.00 -1.00$ -109,383.75 $ -174,864.25 $-12.23 Suministro e instalacion lampara fluorescente 2x96 W, especular completa 12.24 Suministro e instalacin tomacorriente doble con polo a tierra. 12.25 12.26 12.27 12.28 Suministro e instalacin interruptor sencillo incluye: tubo PVC tipo pesado 1/2", alambre de cobre aislado 2xN 12 AWG, caja 5800 plastica, terminales y conectores tipo rosca. Suministro e instalacion de tomacorriente doble con polo a tierra con proteccin GFCI, incluye:tubo PVC tipo pesado 1/2", alambre de cobre aislado 3xN 12 AWG, caja 5800 plastica, terminales y conectores tipo rosca. Suministro e instalacin interruptor doble incluye: tubo PVC tipo pesado 1/2", alambre de cobre aislado 3xN 12 AWG, caja 5800 plastica, terminales y conectores tipo rosca. Suministro e instalacion salida de voz y datos conformada por: tracjack,c6,t568a/b, azul, tracjack,c6,t568a/b, rojo, face plate blanco marfil doble, patch cord cat 6 10 ft (3 metro) azul, guardapolvo azul datos, guardapolvo rojo vozUN UN UN UN UN UN$ 156,738.75 $ 59,686.25 $ 41,543.75 $ 111,061.25 $ 50,525.94 $ 53,892.50$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00$ 156,738.75 $ 59,686.25 $ 41,543.75 $ 111,061.25 $ 50,525.94 $ 53,892.50$$$$$$-0.00 0.00 30.00 12.00 16.00 0.00$$$ 1,246,312.50 $ 1,332,735.00 $ 808,415.00 $17.00 -12.00 2.00$$$ 706,243.75 $ -1,332,735.00 $ 101,051.88 $-0.00 0.00 47.00 0.00 18.00 0.0012.29 Suministro e instalacion de salida para TV incluye: tubo PVC tipo pesado 1/2", cable coaxial, caja 5800 plastica y salida coaxial. 12.30 Suministro e instalacin salida para voz y datos categoria 6 en ducto 100x50 mm 12.31 Suministro e instalacin Ducto 100x50 mm Incluye cubierta de 75 mm de ancho, mas separador central 12.32 Suministro e instalacin Tapa final ducto 100x50mm 12.33 Suministro e instalacin Angulo Interno Variable ducto 100x50mm 12.34 Suministro e instalacin Angulo Externo Variable ducto 100x50mm 12.35 Suministro e instalacin Angulo plano para ducto 100x50mm 12.36 Suministro e instalacin Unin de ductos 100x50mm 12.37 Suministro e instalacin Sujetacables 12.38 Suministro e instalacin salida toma corriente doble regulada tipo modular en ducto 12.39 Suministro e instalacion cable de cobre aislado THWN No 10 awg 12.40 Suministro e instalacin de gabinete pivotante 21 unidades, incluye: Dos (2) patch panel de 24 ptos,un (1) patch panel telefonico 2 hilos 1 female cat 3, Dos (2) organizadores doble tapa, cuarenta y uno (41) patch cord cat 3 1 m azul, veintitres (41) patUN UN UN UN UN UN UN UN UN UN ML UN ML ML UN ML M3 UN ML UN ML ML ML UN UN ML ML$ 56,334.38 $ 178,963.75 $ 63,060.00 $ 4,525.00 $ 28,976.25 $ 27,232.50 $ 43,817.50 $ 11,518.75 $ 3,251.25 $ 38,812.50 $ 5,738.75 $ 12,499,628.75 $ 4,162.50 $ 20,223.75 $ 400,927.19 $ 20,223.75 $ 25,471.88 $ 454,415.63 $ 159,372.50 $ 6,057,767.73 $ 14,616.25 $ 11,322.50 $ 9,197.50 $ 413,821.25 $ 99,856.25 $ 8,446.88 $ 98,368.88$$$$$$$$$$$$$$$$$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ 56,334.38 $ 178,963.75 $ 63,060.00 $ 4,525.00 $ 28,976.25 $ 27,232.50 $ 43,817.50 $ 11,518.75 $ 3,251.25 $ 38,812.50 $ 5,738.75 $ 12,499,628.75 $ 4,162.50 $ 20,223.75 $ 400,927.19 $ 20,223.75 $ 25,471.88 $ 454,415.63 $ 159,372.50 $ 6,057,767.73 $ 14,616.25 $ 11,322.50 $ 9,197.50 $ 413,821.25 $ 99,856.25$$$$$$$$$$$$$$$$$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 311.00 0.00 75.00 19.00 3.00 0.00 1.00 0.00 622.00 0.00 0.00 0.00 67.00 104.00$$$$$$$$$$$$$$ 6,289,586.25 $$ 1,516,781.25 $ 483,965.63 $ 1,363,246.88 $$ 6,057,767.73 $$ 7,042,595.00 $$$$ 565,940.63 $ 10,230,363.00 $0.00 165.81 -274.20 0.00 -75.00 -5.85 -1.00 -311.00$$$$$$$$$$$$$$ -6,289,586.25 $$ -1,516,781.25 $ -149,010.47 $ -454,415.63 $$$$ -3,104,629.50 $$$$$ 16,310,543.160.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.15 2.00 0.00 1.00 0.00 347.80 0.00 0.00 0.00 67.00 269.81 0.00$$$$$$$$$$$$$$$$$ 334,955.16 $ 908,831.25 $$ 6,057,767.73 $$ 3,937,965.50 $$$$ 565,940.63 $ 26,540,906.16 $$$$-12.41 Suministro e instalacin cable UTP Cat 6 certificado 12.42 Suministro e instalacin acometida electrica desde tablero de proteccion general hasta tablero de proteccion parcial en cable de cobre ( 4xNo.6 THHN + Alambre 1xNo.8 TW , en tubera PVC ) en interior de edificio.12.43 Suminstro e instalacin de interruptor termomagntico 3x70 A 12.44 Suministro e instalacin acometida electrica desde tablero de proteccion general hasta tablero de proteccion parcial en cable de cobre ( 4xNo.8 AWG THHN + Alambre 1xNo.8 TW , en tubera PVC ) en interior de edificio.12.45 Excavacion y tapado de zanja 12.46 Suministro e instalacion caja de inspeccin subterranea CS-274, incluye marco y tapa con refuerzo en hierro. 12.47 12.48 Suministro e instalacin acometida electrica desde la subestacion electrica hasta tablero de proteccion general de bloque de las aulas en cable de cobre ( 4xNo.2/0 THHN + Alambre 1xNo.4 T desnudo, en tubera PVC ) Suministro e instalacin tablero de proteccion general compuesto por gabinete de acero inoxidable, para control de alumbrado; beaker totalizador 3x200 a tipo industrial, siete (7) beaker de proteccion ajustable 3x63 a tipo industrial; barrrajes para fase , neutro y tierra.12.49 Suministro e instalacion tuberia conduit PVC 3" 12.50 Suministro e instalacion tuberia conduit PVC 2" 12.51 Suministro e instalacion tuberia conduit PVC 1. 1/2" 12.52 Suministro e insatalacio Lmpara de emergencia para 165 lmenes, 3 horas autonoma. Incluye: Difusor prismtico en acrlico traslcido y Etiqueta autoadhesiva verde con leyenda "SALIDA"ANP 1612.53 Suministro e instalacin de placa de concreto para instalacin de unidad condensadora 12.54 Suministro e instalacion tuberia conduit PVC 1" 12.55 suministro e instalacion de salida para alumbrado interior a la vista en tuberia EMT de 1/2" incluye cable y accesorios de montaje 13 13.2 13.3 15 15.1 ITEMS NO PREVISTOS ANDENES Suministro e instalacin Sardinel prefabricado tipo A10 (0,50*0,80*0,20) filtro en gravilla 1 1/2" Area: 0,60 m2 ITEMS NO PREVISTOS SISTEMA RED CONTRA INCENDIOS Incluye : Bomba principal de alta presion, Bomba jockey, Tablero de control Siemens, Ensamble de Bomba y equipo contraincendio, Instalacion y puesta en marcha de red contraincendio AJUSTE AL PESO OBSERVACION PARA LIQUIDACION FINAL DE OBRA : UNA VEZ REVISADAS LAS CANTIDADES FINALES PARA LA LIQUIDACION DE LA OBRA ,SE PROCEDIO A REALIZAR EL ACTA MODIFICATORIA No 5, DONDE QUEDAN REGISTRADAS LAS MAYORES Y MENORES CUANTIAS POR ITEM.ML ML$ 57,875.00 $ 90,920.00$$-0.00 0.00$ 57,875.00 $ 90,920.00$$-0.00 0.00$$$-$$-0.00 0.00GL$ 85,687,606.88$-0.00$ 85,687,606.88$-0.00$$ 2,251.00$-0.00$$ 2,885.00VR. ACTUAL. MOD. 4$ 2,648,929,512.00VR. ACTUAL. MOD. 5$ 2,648,929,512.00Para constancia de lo anterior firman la presente acta parcial, los que en ella intervinieron, en Aguazul, a los DOCE (12) DIAS DEL MES DE NOVIEMBRE DE 2008.OSCAR MAURICIO BUTRON GELVEZ R/L UNION TEMPORAL SAN AGUSTIN NOTA: LAS CANTIDADES Y VALORES CONSIGNADOS EN LA PRESENTE ACTA SON RESPONSABILIDAD EXCLUSIVA DEL INTERVENTOR Y EL CONTRATISTA Original: Oficina Juridica 1era copia: Contratista 2da copia: Interventor 3era copia: Dependencia responsable del contrato ING. ANGELA PAOLA RIOS. Vo Bo SECRETARIA DE OBRAS PUBLICAS CONTRATISTAARQ. WILSON LOPEZ BOGOTA R/L SERIARQ LTDA. INTERVENTORCONTRATO No : 117 DEL 2006 OBJETO: EL CONTRATISTA SE OBLIGA PARA CON EL MUNICIPIO A REALIZAR POR EL SISTEMA DE PRECIOS UNITARIOS SIN FORMULA DE REAJUSTE LA CONSTRUCCION SEGUNDA ETAPA SEDE COLEGIO SAN AGUSTIN DEL MUNICIPIO DE AGUAZUL, DEPARTAMENTO DE CASANARE. CONTRATISTA: INTERVENTOR: FECHA DE INICIACION: PLAZO INICIAL PLAZO ADICIONAL FECHA DE TERMINACION: VALOR INICIAL : VALOR ADICIN: VALOR TOTAL: UNION TEMPORAL SAN AGUSTIN SERIARQ LTDA. 2 de August de 2006 UN( 01) AO CUATRO (4) MESES 5 DE JUNIO DE 2008 $ 1,799,865,952.00 $ 849,063,560.00 $ 2,648,929,512.00ACTA DE MODIFICACION DE OBRA No. 05PRESENTE ACTA DE LIQUIDACION FINALACUMULADO LIQUIDACION FINALFECHA : FECHA : 23 DE SEPTIEMBRE DE 2008FECHA : 12 DE NOVIEMBRE DE 2008 12 DE NOVIEMBRE DE 2008REPUBLICA DE COLOMBIA DEPARTAMENTO DE CASANARE MUNICIPIO DE AGUAZULVALOR TOTAL ACTA DE MODIFICACION 05:VALOR PRESENTE ACTAVALOR ACUMULADO$ 2,648,929,512$ 463,270,711.00$ 2,632,944,388.00CONDICIONES ORIGINALESCONDICION ACTUALIZADA SEGN MODIFICACION 05 VALOR CANT. VALORACTA DE LIQUIDACION FINAL CANT. VALORACUMULADO LIQUIDACION FINAL CANT. VALORITEM 1 2 2.1 2.2 3 3.1 3.2 3.3 3.4 3.5 3.6 3.7 4 4.1 4.2 5 5.4 5.5 6 6.1 6.2 6.3 6.6 7 7.1 7.2 8 8.1 8.2 8.3 10 10.9 11 11.1 11.2 PRELIMINARES MOVIMIENTO DE TIERRAS Excavacin manual y retiro de material comn Relleno material seleccionado de la excavacin ESTRUCTURA EN CONCRETODESCRIPCIONUNDCANT.P/UNITARIOVALORCANT.P/UNITARIO$ 44,553,200.00 M3 M3 348.93 673.50 $ 31,200.00 $ 35,200.00 $M2 M3 M3 M3 M3 UN KG 271.06 96.16 14.76 17.57 30.61 1.00 21,125.29 $ 17,970.49 $ 462,485.80 $ 462,485.80 $ 462,485.80 $ 741,165.86 $ 2,431,121.88 $ 4,056.25 $ 4,871,080.34 $ 44,472,634.53 $ 6,826,290.41 $ 8,125,875.51 $ 22,687,087.05 $ 2,431,121.88 $ 85,689,457.56 271.06 96.16 14.76 17.57 30.61 1.00 21,125.29 $ 17,970.49 $ 462,485.80 $ 462,485.80 $ 462,485.80 $$ 2,431,121.88 $ 4,056.25 $ 4,871,080.34 $ 44,472,634.53 $ 6,826,290.41 $ 8,125,875.51 $ 22,687,087.05 $ 2,431,121.88 $ 85,689,457.56 195.74 60.47 11.69 38.04 123.78 2.00 85,268.17 $ 10,886,616.00 $ 23,707,200.00 348.93 673.50 $ 31,200.00 $ 35,200.00 $ 10,886,616.00 $ 23,707,200.00 868.86 495.59 $ 27,108,432.00 $ 17,444,768.00 $ 496,956,247.15 $ 3,517,543.22 $ 27,966,516.33 $ 5,406,459.00 $ 17,592,959.83 $ 91,741,510.46 $ 4,862,243.75 $ 345,869,014.56 $ 274,167,017.30 M2 ML 1,775.37 184.00 $ 101,150.79 $ 17,700.00 $ 143,664,058.88 1,775.37 184.00 $ 101,150.79 $ 17,700.00 $ 179,580,073.60 $ 3,256,800.00 2,571.17 796.11 $ 260,075,870.30 $ 14,091,147.00 $ 4,907,994.14 M2 M2 1,082.67 422.40 $ 33,692.68 $ 37,871.24 $ 36,478,048.44 $ 12,797,448.58 1,082.67 422.40 $ 33,692.68 $ 37,871.24 $ 36,478,048.44 $ 15,996,810.72 107.79 33.70 $ 3,631,733.44 $ 1,276,260.70 $ 27,084,408.11 M2 M2 M2 ML 2,137.30 1,085.16 57.60 $ 13,335.00 $ 15,748.13 $ 16,085.00 $ 9,247.50 $ 28,500,895.50 $ 17,089,235.33 $ 926,496.00 $2,137.30 1,085.16 57.60 0.00 $ 13,335.00 $ 15,748.13 $ 16,085.00 $ 9,247.50 $ 28,500,895.50 $ 17,089,235.33 $ 926,496.00 $384.69 194.02 0.00 2,043.70 0.00 M2 M2 3,335.76 57.60 $ 7,787.50 $ 16,189.29 $ 25,977,231.00 $ 932,502.96 3,335.76 57.60 $ 7,787.50 $ 16,189.29 $ 25,977,231.00 $ 932,502.96 0.00 0.00 0.00 M2 M2 ML 2,648.31 2,669.23 1,034.20 $ 18,583.91 $ 66,193.75 $ 24,835.63 $ 49,215,961.31 $ 176,686,343.31 $ 25,685,003.38 2,648.31 2,669.23 1,034.20 $ 18,583.91 $ 66,193.75 $ 24,835.63 $ 49,215,961.31 $ 176,686,343.31 $ 25,685,003.38 3,237.17 0.00 0.00 0.00 ML 25.00 $ 102,745.84 $ 2,568,645.94 25.00 $ 102,745.84 $ 2,568,645.94 0.00 0.00 UN ML 6.00 20.00 $ 146,412.50 $ 52,849.69 $ 878,475.00 $ 1,056,993.75 6.00 20.00 $ 146,412.50 $ 52,849.69 $ 878,475.00 $ 1,056,993.75 6.00 84.40 $ 5,129,841.15 $ 3,055,451.21 $$ 18,899,115.75 $$$$ 60,159,284.03 $ 60,159,284.03 $$$$$ 15,849,898.74 $ 878,475.00 $ 4,460,513.63 -3.00 -29.00 0.00 1,464.24 0.00 0.00 0.00 0.00 -23.94 194.02 0.00 -136.30 -287.21 33.70 1,471.17 0.00 0.00 0.00 2.50 0.00 1.73 0.00 5,471.54 169.39 66.82$ 7,637,032.00 $ 5,284,968.00 $ 2,352,064.00 $ 24,632,365.57 $$$ 1,156,214.50 $$ 1,282,216.94 $$ 22,193,934.13 $ 148,810,004.05 $ 148,810,004.05 $$ -8,400,612.49 $ -9,676,873.19 $ 1,276,260.70 $ 1,475,777.06 $ -319,239.90 $ 3,055,451.21 $$ -1,260,434.25 $$$$ 27,211,308.04 $ 27,211,308.04 $$$$$ -3,253,998.75 $ -439,237.50 $ -1,532,640.94 6.00 84.40 0.00 3,237.17 0.00 0.00 0.00 0.00 384.69 194.02 0.00 2,043.70 107.79 33.70 2,571.17 796.11 195.74 60.47 11.69 38.04 123.78 2.00 85,268.17 868.86 495.59$ 44,553,200.00 $ 27,108,432.00 $ 17,444,768.00 $ 496,956,247.15 $ 3,517,543.22 $ 27,966,516.33 $ 5,406,459.00 $ 17,592,959.83 $ 91,741,510.46 $ 4,862,243.75 $ 345,869,014.56 $ 274,167,017.30 $ 260,075,870.30 $ 14,091,147.00 $ 4,907,994.14 $ 3,631,733.44 $ 1,276,260.70 $ 27,084,408.11 $ 5,129,841.15 $ 3,055,451.21 $$ 18,899,115.75 $$$$ 60,159,284.03 $ 60,159,284.03 $$$$$ 15,849,898.74 $ 878,475.00 $ 4,460,513.63Solado en concreto de 3000 PSI e= 0,05 m para zapatas Concreto de 3000 psi para zapatas Concreto de 3000 psi para pedestales Concreto de 3000 psi para vigas de cimentacin Concreto de 3000 psi para columnas Estructura de escalera en concreto de 3000 psi y acero de refruerzo de 60,0000 psi acero de refuerzo de 60.000 psi ESTRUCTURA METLICA DE CUBIERTA Suministro e instalacion de lamina termo acustica monolitica, Incluye los anclajes necesarios para fijar a la correa. TEMPLETE en varilla lisa de 1/2" con extremos roscados. MAMPOSTERIA Muro en bloque No. 5. Primer nivel Muro en bloque No. 5. Segundo nivel PAETE Y ESTUCO Paete en mortero 1:5, e= 1,5 cm. pulido para muros 1er piso Paete en mortero 1:5, e= 1,5 cm. pulido para muros 2do piso Paete liso en mortero 1:4, e= 2,0 cm. pulido con cal para tableros Paete en morteron 1:4 e=1,5 cm. pulido para columnas,losa y vigas. PINTURA Pintura en vinilo tipo 1, incluye lineales Pintura en esmalte mate para tableros PISO Y ENCHAPE Plantilla de nivelacin de pisos e=3cms Suministro e instalacin de cermica trafico 5 para pisos, formato 30x30 Suministro e instalacin de guarda escoba en ceramica. CARPINTERIA Pasamanos escalera y rampa tubera galvanizada D= 1 1/2" INSTALACIONES HIDROSANITARIAS Construccin caja de inspeccin de 0,6x0,6 en mampostera y concreto Suministro e instalacin tubera pvc sanitaria 4"11.3 11.4 11.5 11.6 11.7 11.8 11.9 11.10 12 12.1 12.2 12.3 12.4 12.5 12.6 12.7 12.8 12.9 12.10 12.11 12.12 12.13 12.14 12.15 12.16 12.17 12.18 12.19 12.20 12.21 12.22 13 13.1 14 14.1 1 1.1 2 2.3 2.4 2.5 3 3.8 3.9 3.10Suministro e instalacin tubera pvc sanitaria 3" Suministro e instalacin tubera pvc sanitaria 2" Punto hidrulico 1/2" Punto sanitario 2" Punto sanitario 3" Suministro e instalacin tubera pvc hidrulica 1" RDE 21 Suministro e instalacin tubera pvc hidrulica " RDE 21 Suministro e instalacin de rejillas de piso 3" INSTALACIONES ELECTRICAS, DATOS Y AIRE ACONDICIONADO Punto para lmparas y ventiladores Punto para tomacorriente Punto para tomacorriente con polo a tierra Lmparas fluorescentes de 2" x 48" Suministro e instalacin de ventiladores Suministro e instalacin de breakers de 15 20 A Suministro e instalacin de Interruptor termo magntico 3 polos x 30 Amps. Suministro e instalacin de extractores de aire Suministro e instalacin de tablero trifsico 12 circuitos con puerta y llave Suministro e instalacin de luminarias de Sodio 70W con soporte vertical, certificada. Suministro e instalacin de pedestal en concreto para base ornamental Suministro e instalacin base ornamental con tubo galvanizado en caliente tipo pesado de 2"x6 m pintado con white primer, anticorrosivo y anoloc. Suministro e instalacin de acometida en alambre de cobre 3xNo.10 THHN +1xNo.10 THHN + Alambre 1xNo.10 TW, en tubera PVC 3/4" Suministro e instalacin de interruptor termo magntico 3x30 Amperios Suministro e instalacin Lmpara de emergencia para 165 lmenes, 3 horas autonoma. Suministro e instalacin de cableado estructurado en interiores Suministro e instalacin de sistema de aire acondicionado de 5 TR, 3 ph, tipo split. Suministro e instalacin de rejilla de retorno 20"x20" para sistema de aire acondicionado Suministro e instalacin de Ductera de suministro en fibra de vidrio para sistema de aire acondicionado Suministro e instalacin de rejilla multidireccional con damper aleta mvil de 10"x10" para sistema de aire acondicionado Suministro e instalacin de acometida en cable de cobre 3xNo.6 THHN +1xNo.6 THHN + Alambre 1xNo.10 TW, en tubera PVC 1" Suministro e instalacin de Interruptor termomagntico 3 polos x 60 Amps. ANDENES Plantilla en concreto de 3000 psi e= 5 cm LIMPIEZA Limpieza general de muros, pisos y retiro de escombros ITEMS NO PREVISTOS PRELIMINARES Localizacin y replanteo comision topografica ITEMS NO PREVISTOS MOVIMIENTO DE TIERRAS Excavacin mecnica Subbase triturada de D = 1 1/2" Relleno con material comn de prstamo ITEMS NO PREVISTOS ESTRUCTURA EN CONCRETO Solado en concreto para vigas de amarre a=0.25 e=0.05 Concreto de 3000 psi para placa aligerada de entrepiso, incluye vigas y viguetas. e=35 cm Concreto de 3000 psi para rampaML ML UN UN UN ML ML UN36.00 12.80 16.00 16.00 4.00 24.00 44.00 4.00$ 41,806.88 $ 27,489.38 $ 35,231.25 $ 62,834.29 $ 74,159.29 $ 15,626.25 $ 13,001.25 $ 18,918.75$ 1,505,047.50 $ 351,864.00 $ 563,700.00 $ 1,005,348.57 $ 296,637.14 $ 375,030.00 $ 572,055.00 $ 75,675.0036.00 12.80 16.00 16.00 4.00 24.00 44.00 4.00$ 41,806.88 $ 27,489.38 $ 35,231.25 $ 62,834.29 $ 74,159.29 $ 15,626.25 $ 13,001.25 $ 18,918.75$ 1,505,047.50 $ 351,864.00 $ 563,700.00 $ 1,005,348.57 $ 296,637.14 $ 375,030.00 $ 572,055.00 $ 75,675.0046.90 118.80 55.00 35.00 8.00 15.50 24.00 0.00 0.00$ 1,960,742.44 $ 3,265,737.75 $ 1,937,718.75 $ 2,199,200.00 $ 593,274.29 $ 242,206.88 $ 312,030.00 $$ 27,549,362.51 $ 12,725,268.75 $ 11,092,778.13 $$$$$$$ 3,731,315.63 $$$$$$$$$$$$$$$$ 780,208.34 $ 780,208.34 $ 8,231,700.00 $ 8,231,700.00 $ 42,140,840.61 $ 1,242,782.40 $ 22,689,673.32 $ 18,208,384.89 $ 545,707,364.10 $ 3,993,100.68 $ 331,178,957.56 $ 13,192,752.35-27.50 0.00 0.00 0.00 0.00 0.00 0.00 -7.00$ -1,149,689.06 $$$$$$$ -132,431.25 $ 813,543.7446.90 118.80 55.00 35.00 8.00 15.50 24.00 0.00$ 1,960,742.44 $ 3,265,737.75 $ 1,937,718.75 $ 2,199,200.00 $ 593,274.29 $ 242,206.88 $ 312,030.00 $$ 27,549,362.51UN UN UN UN UN UN UN UN UN UN UN UN ML UN UN MI UN UN M2 UN ML UN329.00 24.00 54.00 216.00 98.00 68.00 4.00 4.00 2.00 5.00 11.00 11.00 125.00 1.00$ 78,551.04 $ 77,571.88 $ 75,459.38 $ 99,217.32 $ 339,988.54 $ 22,965.23 $ 281,160.94 $ 307,488.54 $ 414,590.63 $ 454,465.63 $ 63,466.41 $ 173,357.81 $ 35,757.81 $ 256,160.94 $ 354,943.75$ 25,843,292.71 $ 1,861,725.00 $ 4,074,806.25 $ 21,430,940.63 $ 33,318,877.08 $ 1,561,635.94 $ 1,124,643.75 $ 1,229,954.15 $ 829,181.25329.00 24.00 54.00 216.00 98.00 68.00 4.00 4.00 2.00 5.00$ 78,551.04 $ 77,571.88 $ 75,459.38 $ 99,217.32 $ 339,988.54 $ 22,965.23 $ 281,160.94 $ 307,488.54 $ 414,590.63 $ 454,465.63 $ 63,466.41 $ 173,357.81 $ 35,757.81 $ 256,160.94 $ 354,943.75 $ 24,808.75 $ 9,855,425.00 $ 258,709.38 $ 68,289.59 $ 103,196.88 $ 54,228.75 $ 281,160.94$ 25,843,292.71 $ 1,861,725.00 $ 4,074,806.25 $ 21,430,940.63 $ 33,318,877.08 $ 1,561,635.94 $ 1,124,643.75 $ 1,229,954.15 $ 829,181.25 $ 2,272,328.13 $ 698,130.47 $ 1,906,935.94 $ 4,469,726.56 $ 256,160.94 $$ 7,467,433.75 $ 29,566,275.00 $ 517,418.75 $ 3,960,796.08 $ 825,575.00 $ 3,796,012.50 $ 281,160.94162.00 143.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00-3.00 46.00 0.00 0.00 0.00 -44.00 -1.00 0.00 0.00 0.00 0.00 0.00 -20.00 -2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ -235,653.13 $ 3,568,306.25 $$$$ -1,010,470.31 $ -281,160.94 $$$$$$ -715,156.25 $ -512,321.88 $$$$$$$$$-162.00 143.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ 12,725,268.75 $ 11,092,778.13 $$$$$$$ 3,731,315.63 $$$$$$$$$$$$$$-$ 698,130.47 $ 1,906,935.94 $ 4,469,726.56 $ 256,160.9411.00 11.00 125.00 1.00 0.00301.00 3.00 2.00 58.00 8.00 70.00 1.00$ 24,808.75 $ 9,855,425.00 $ 258,709.38 $ 68,289.59 $ 103,196.88 $ 54,228.75 $ 281,160.94$ 7,467,433.75 $ 29,566,275.00 $ 517,418.75 $ 3,960,796.08 $ 825,575.00 $ 3,796,012.50 $ 281,160.94301.00 3.00 2.00 58.00 8.00 70.00 1.00M2$ 26,360.41$-0.00$ 26,360.41$-0.00 0.000.00$$ 780,208.340.00$$ 780,208.34GL3.00$ 780,208.34$ 2,340,625.013.00$ 780,208.34$ 2,340,625.011.00 0.001.00$ 780,208.34 $-1.00$ 780,208.34 $ 8,231,700.00M2$ 3,450.00$-0.00$ 3,450.00$-2,386.00 0.000.00$$ 14,381,482.702,386.00$ 8,231,700.00 $ 42,140,840.61M3 M3 M3$ 4,560.00 $ 50,403.58 $ 37,838.75$$$-0.00 0.00 0.00$ 4,560.00 $ 50,403.58 $ 37,838.75$$$-272.54 450.16 481.21 0.0063.52 279.58 0.00$ 289,651.20 $ 14,091,831.50 $$ 703,023.95272.54 450.16 481.21$ 1,242,782.40 $ 22,689,673.32 $ 18,208,384.89 $ 545,707,364.10ML M2 M3$ 6,561.13 $ 194,987.79 $ 741,165.86$$$-0.00 0.00 0.00$ 6,561.13 $ 194,987.79 $ 741,165.86$$$-608.60 1,698.46 17.800.00 0.00 0.00$$$-608.60 1,698.46 17.80$ 3,993,100.68 $ 331,178,957.56 $ 13,192,752.353.11 3.12 3.13 3.14 3.15 3.16 4 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 4.14 5 5.1 5.2 5.3 5.6 5.7 5.8 5.9 5.10 5.11 5.12 5.13 5.14 5.15 6 6.4 6.5 8 8.4 8.5 8.6 8.7 8.8 8.9 9 9.1Concreto vigade confinamiento patio interior(0,20*0,15). Incluye refuerzo Placa en concreto de 3000 psi e=10 cm. Nivel 0,0 Malla electrosoldada 4 mm.M-084. Concreto Ciclopeo. ( 60/40 ) Concreto 3000 p.s.i. Para vigas de amarre y corona segundo piso. Concreto 3000 p.s.i. para viga canal. ( incluye refuerzo ) ITEMS NO PREVISTOS ESTRUCTURA METLICA DE CUBIERTA CERCHA METLICAS. Tubos con elementos diagonales y verticales . SEGN DISEO. VIENTOS EN VARILLA LIZA D=5/8" CON EXTREMOS ROSCADOS PUNTO DE APOYO. PLATINA 250*250*12 mm CON 4 PERFORACIONES DE D=5/8". INCLUYE PERNOS PUNTO DE APOYO. PLATINA 300*300*12 mm CON 4 PERFORACIONES DE D=5/8". INCLUYE PERNOS PUNTO DE APOYO. PLATINA 150*150*12 mm CON 4 PERFORACIONES DE D=5/8". INCLUYE PERNOS PLATINA UNIN CORREA 254 mm - VIGA CORONA 170*80*6 mm. PLATINA UNIN CORREA 125 mm - VIGA CORONA 150*80*6 mm. CARTELA 150*80*3 mm. CARTELA 100*80*3 mm. CANAL DE AGUAS LLUVIAS EN LAMINA GALVANIZADA. CORREAS METLICAS PHR 125*50*1,5mm CORREAS METLICAS PHR 254*63*2mm ITEMS NO PREVISTOS MAMPOSTERIA Mesn loza en concreto acabado en granito pulido.e=7 cm. Alfaja en concreto.(0,25*0,10). Incluye refuerzo Muro en ladrillo rejilla a la vista 1 cara Dintel en concreto,(0,20*0,25).incluye refuerzo Limpieza y lavado de mampostera Inmunizacin mampostera Anclaje muro esbelto hiero 1/2 " Anclaje muro hierro 1/4 " Enchape en ladrillo rejilla a la vista para vigas Enchape en ladrillo rejilla a la vista para vigas con Gotero. Gotero en mortero Alfagia corona. Concreto 3000 p.s.i.incluye refuerzo.(0,07*0,7) Alfagia base de persianas.concreto de 3000 p.s.i. incluye refuerzo.(0,07*0,42) ITEMS NO PREVISTOS PAETE Y ESTUCO Estuco Paete en mortero 1:4 e=1,5 cm para placa de entrepiso ITEMS NO PREVISTOS PISO Y ENCHAPE Suministro e instalacin de tabln de gress para pisos exteriores, formato 20x20. Suministro e instalacin de guarda escoba en gres. Dilatacin en gravilla lavada para pisos exteriores.Hasta 10 cm. Cermica blanca. Enchape pared baos.(23,3*30,5) Cermica granilla negra. Enchape piso baos.(30,5*30,5) Enchape columnas en ladrillo ITEMS NO PREVISTOS APARATOS SANITARIOS suministro e instalacin de sanitario tipo econmicoML M2 KG M3 M3 ML$ 37,716.41 $ 52,714.59 $ 5,837.50 $ 291,666.66 $ 772,265.63 $ 492,646.88$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00$ 37,716.41 $ 52,714.59 $ 5,837.50 $ 291,666.66 $ 772,265.63 $ 492,646.88$$$$$$-88.50 1,869.96 5,065.21 19.56 40.77 58.20 0.00$ 3,337,902.51 $ 98,574,170.04 $ 29,568,163.38 $ 5,704,999.92 $ 31,485,269.53 $ 28,672,048.13 $ 315,168,019.25 $ 151,681,466.75 $ 3,840,000.00 $ 6,110,160.00 $ 6,625,342.50 $ 9,361,370.00 $ 503,968.75 $ 2,857,140.00 $ 5,037,730.00 $ 5,582,508.75 $ 32,344,882.50 $ 78,584,412.50 $ 12,639,037.50 $ 610,538,525.84 $ 9,005,140.83 $ 10,815,774.86 $ 289,002,163.13 $ 43,987,369.91 $ 65,204,118.75 $ 56,149,992.50 $ 16,821,274.21 $ 57,185,041.64 $ 26,902,196.72 $ 7,781,501.26 $ 1,034,741.47 $ 26,649,210.56 $$ 33,578,554.20 $$ 33,578,554.20 $ 40,428,085.63 $$$$$$ 40,428,085.63 $ 1,110,572.78 $-0.00 0.50 0.00 2.32 0.00 0.00$$ 26,357.29 $$ 676,666.66 $$$ 51,031,648.2588.50 1,869.96 5,065.21 19.56 40.77 58.20$ 3,337,902.51 $ 98,574,170.04 $ 29,568,163.38 $ 5,704,999.92 $ 31,485,269.53 $ 28,672,048.13 $ 315,168,019.25KG ML UN UN UN UN UN UN UN ML ML ML$ 12,925.00 $ 20,000.00 $ 145,480.00 $ 157,746.25 $ 126,505.00 $ 20,158.75 $ 19,841.25 $ 6,113.75 $ 5,996.25 $ 123,453.75 $ 42,023.75 $ 46,811.25$$$$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ 12,925.00 $ 20,000.00 $ 145,480.00 $ 157,746.25 $ 126,505.00 $ 20,158.75 $ 19,841.25 $ 6,113.75 $ 5,996.25 $ 123,453.75 $ 42,023.75 $ 46,811.25$$$$$$$$$$$$-11,735.51 192.00 42.00 42.00 74.00 25.00 144.00 824.00 931.00 262.00 1,870.00 270.00 0.003,948.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ 51,031,648.25 $$$$$$$$$$$$ 147,551,320.3311,735.51 192.00 42.00 42.00 74.00 25.00 144.00 824.00 931.00 262.00 1,870.00 270.00$ 151,681,466.75 $ 3,840,000.00 $ 6,110,160.00 $ 6,625,342.50 $ 9,361,370.00 $ 503,968.75 $ 2,857,140.00 $ 5,037,730.00 $ 5,582,508.75 $ 32,344,882.50 $ 78,584,412.50 $ 12,639,037.50 $ 610,538,525.84M2 ML M2 ML M2 M2 ML PTO ML ML ML ML ML$ 144,174.53 $ 46,229.16 $ 81,412.50 $ 116,365.63 $ 13,575.00 $ 11,690.00 $ 17,357.09 $ 9,087.09 $ 38,953.13 $ 63,413.75 $ 11,879.93 $ 169,956.70 $ 115,696.70$$$$$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ 144,174.53 $ 46,229.16 $ 81,412.50 $ 116,365.63 $ 13,575.00 $ 11,690.00 $ 17,357.09 $ 9,087.09 $ 38,953.13 $ 63,413.75 $ 11,879.93 $ 169,956.70 $ 115,696.70$$$$$$$$$$$$$-62.46 233.96 3,549.85 378.01 4,803.25 4,803.25 969.13 6,293.00 690.63 122.71 87.10 156.80 0.00 0.00-7.54 233.96 -7.61 192.74 2,028.25 2,028.25 201.10 4,493.00 240.63 30.71 -1.10 53.80 0.00$ -1,087,075.92 $ 10,815,774.86 $ -619,549.13 $ 22,428,310.56 $ 27,533,493.75 $ 23,710,242.50 $ 3,490,510.30 $ 40,828,284.14 $ 9,373,290.47 $ 1,947,436.26 $ -13,067.92 $ 9,143,670.46 $$ 33,578,554.2062.46 233.96 3,549.85 378.01 4,803.25 4,803.25 969.13 6,293.00 690.63 122.71 87.10 156.80 0.00$ 9,005,140.83 $ 10,815,774.86 $ 289,002,163.13 $ 43,987,369.91 $ 65,204,118.75 $ 56,149,992.50 $ 16,821,274.21 $ 57,185,041.64 $ 26,902,196.72 $ 7,781,501.26 $ 1,034,741.47 $ 26,649,210.56 $$ 33,578,554.20M2 M2$ 8,137.50 $ 19,770.00$$-0.00 0.00$ 8,137.50 $ 19,770.00$$-0.00 1,698.46 0.000.00 1,698.46$$ 33,578,554.20 $ 4,174,726.130.00 1,698.46$$ 33,578,554.20 $ 40,428,085.63M2 ML ML M2 M2 ML$ 52,209.56 $ 22,710.63 $ 29,906.25 $ 40,826.84 $ 44,182.06 $ 32,612.50$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00$ 52,209.56 $ 22,710.63 $ 29,906.25 $ 40,826.84 $ 44,182.06 $ 32,612.50$$$$$$-0.00 0.00 0.00 0.00 0.00 1,239.65 0.000.00 0.00 0.00 0.00 0.00 128.01$$$$$$ 4,174,726.13 $ 111,159.030.00 0.00 0.00 0.00 0.00 1,239.65$$$$$$ 40,428,085.63 $ 1,110,572.78UN$ 257,175.00$-0.00$ 257,175.00$-0.000.00$-0.00$-9.2 9.3 9.4 9.5 9.6 9.7 10 10.1 10.2 10.3 10.4 10.5 10.6 10.7 10.8 10.10 11 11.11 11.12 11.13 11.14 11.15 11.16 11.17 11.18 11.19 11.20 11.21 11.22 11.23 11.24 11.25 11.26 11.27 11.28 12 12.23 12.24 12.25 12.26 12.27 12.28 12.29 12.30 12.31Sanitario minusvalidos Lavamanos de empotrar lnea econmica con grifera tipo push Ducha sencilla Poceta en acero inoxidable 50x60 con pestaa y gritera mezcladora Orinal en mampostera y enchapado 7,0*0,5*0,3 m. Suministro e instalacin de espejos claros 4 mm ITEMS NO PREVISTOS CARPINTERIA Suministro e instalacin de puerta metlica en lamina coll rol.interior baos Puerta en madera entamborada doble abra;cerradura convencional; 1,85*2,0; Visor 0,4*0,4 Puerta en madera entamborada doble abra;cerradura convencional; 1,40*2,0; Visor 0,4*0,4 Puerta en madera entamborada doble abra;cerradura convencional ; 2,4*2,0; Puerta en madera entamborada una abra. Cerradura convencional Ventana corrediza en aluminio Anoloc con vidrio Persiana en aluminio fija con vidrio.Altura menor a h= 1,0 m Persiana en aluminio fija con vidrio.Altura mayor o igual a h= 1,0 m Baranda para escalera y rampa en tubera galvanizada D=1 1/2" ITEMS NO PREVISTOS INSTALACIONES HIDROSANITARIAS Punto hidrulico 3/4" Punto sanitario 4" Suministro e instalacin rejilla de piso 2" Suministro e instalacin rejilla de piso 4" Suministro e instalacin tubera pvc sanitaria 6" Construccin caja de inspeccin de 0,7*0,7 en mampostera y concreto Construccin caja de inspeccin de 0,8*0,8 en mampostera y concreto Construccin caja de inspeccin de 1,0*1,0 en mampostera y concreto Construccin caja de inspeccin de 1,0*0,5 en mampostera y concreto.(Caja aguas lluvias). Suministro e instalacin tubera pvc aguas lluvias 3" Suministro e instalacin tubera pvc aguas lluvias 8" Suministro e instalacin de rejilla metlica 1 X 0,5 m para cajas de aguas lluvias. Suministro e instalacin tubera pvc hidrulica 2" RDE 21 Suministro e instalacin tubera pvc hidrulica 1-1/4" RDE 21 Suministro e instalacin tubera pvc hidrulica 3/4" RDE 21 Suministro e instalacin tubera pvc hidrulica 1/2" RDE 9 Caja de lavado en mampostera y enchape. Caja de lavado taller de ceramica y arte,en mamposteria y enchape.(2,7*0,5) ITEMS NO PREVISTOS INSTALACIONES ELECTRICAS, DATOS Y AIRE ACONDICIONADO Suministro e instalacion lampara fluorescente 2x96 W, especular completa Suministro e instalacin tomacorriente doble con polo a tierra. Suministro e instalacin interruptor sencillo incluye: tubo PVC tipo pesado 1/2", alambre de cobre aislado 2xN 12 AWG, caja 5800 plastica, terminales y conectores tipo rosca. Suministro e instalacion de tomacorriente doble con polo a tierra con proteccin GFCI, incluye:tubo PVC tipo pesado 1/2", alambre de cobre aislado 3xN 12 AWG, caja 5800 plastica, terminales y conectores tipo rosca. Suministro e instalacin interruptor doble incluye: tubo PVC tipo pesado 1/2", alambre de cobre aislado 3xN 12 AWG, caja 5800 plastica, terminales y conectores tipo rosca. Suministro e instalacion salida de voz y datos conformada por: tracjack,c6,t568a/b, azul, tracjack,c6,t568a/b, rojo, face plate blanco marfil doble, patch cord cat 6 10 ft (3 metro) azul, guardapolvo azul datos, guardapolvo rojo voz Suministro e instalacion de salida para TV incluye: tubo PVC tipo pesado 1/2", cable coaxial, caja 5800 plastica y salida coaxial. Suministro e instalacin salida para voz y datos categoria 6 en ducto 100x50 mm Suministro e instalacin Ducto 100x50 mm Incluye cubierta de 75 mm de ancho, mas separador centralUN UN UN UN UN M2$ 319,675.00 $ 350,575.00 $ 50,206.25 $ 231,000.00 $ 949,207.50 $ 88,156.25$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00$ 319,675.00 $ 350,575.00 $ 50,206.25 $ 231,000.00 $ 949,207.50 $ 88,156.25$$$$$$-0.00 0.00 0.00 0.00 1.17 0.00 0.00$$$$$ 1,110,572.78 $$ 21,567,047.98 $$$$$$$$$ 21,567,047.98 $ 37,239,906.26 $$ 1,334,867.18 $$$ 4,237,553.72 $ 393,445.00 $ 438,290.18 $ 1,491,262.50 $ 1,629,562.50 $ 21,985,189.43 $$ 1,464,747.50 $ 143,370.00 $ 56,070.00 $ 419,850.00 $ 2,703,341.25 $ 349,728.50 $ 592,628.50 $ 41,208,389.56 $$$ 1,952,556.25 $$ 909,466.88 $$$$-0.00 0.00 -1.00 0.00 0.17 0.00$$$ -50,206.25 $$ 161,365.28 $$ 9,593,382.980.00 0.00 0.00 0.00 1.17 0.00$$$$$ 1,110,572.78 $$ 21,567,047.98UN UN UN UN UN M2 ML M2 ML$ 237,440.63 $ 1,095,459.16 $ 874,050.00 $ 1,079,509.17 $ 345,600.00 $ 287,266.00 $ 272,650.00 $ 285,775.00 $ 206,442.50$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ 237,440.63 $ 1,095,459.16 $ 874,050.00 $ 1,079,509.17 $ 345,600.00 $ 287,266.00 $ 272,650.00 $ 285,775.00 $ 206,442.50$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 104.47 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 46.47$$$$$$$$$ 9,593,382.98 $ -7,790,945.530.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 104.47$$$$$$$$$ 21,567,047.98 $ 35,775,158.76UN UN UN UN ML UN UN UN UN ML ML UN ML ML ML ML UN UN$ 40,242.24 $ 74,159.29 $ 17,793.75 $ 21,527.50 $ 63,152.81 $ 196,722.50 $ 219,145.09 $ 248,543.75 $ 162,956.25 $ 26,916.25 $ 73,901.79 $ 146,474.75 $ 23,895.00 $ 16,020.00 $ 13,995.00 $ 15,626.25 $ 174,864.25 $ 296,314.25$$$$$$$$$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ 40,242.24 $ 74,159.29 $ 17,793.75 $ 21,527.50 $ 63,152.81 $ 196,722.50 $ 219,145.09 $ 248,543.75 $ 162,956.25 $ 26,916.25 $ 73,901.79 $ 146,474.75 $ 23,895.00 $ 16,020.00 $ 13,995.00 $ 15,626.25 $ 174,864.25$$$$$$$$$$$$$$$$$-0.00 18.00 0.00 0.00 67.10 2.00 2.00 6.00 10.00 816.80 0.00 10.00 6.00 3.50 30.00 173.00 2.00 2.00 0.00-16.00 0.00 0.00 0.00 -150.50 0.00 0.00 0.00 0.00 101.80 0.00 -5.00 0.00 0.00 0.00 0.00 2.00 0.00$ -643,875.80 $$$$ -9,504,498.28 $$$$$ 2,740,073.80 $$ -732,373.75 $$$$$ 349,728.50 $$ 10,230,731.150.00 18.00 0.00 0.00 67.10 2.00 2.00 6.00 10.00 816.80 0.00 0.00 6.00 3.50 30.00 173.00 2.00 2.00$$ 1,334,867.18 $$$ 4,237,553.72 $ 393,445.00 $ 438,290.18 $ 1,491,262.50 $ 1,629,562.50 $ 21,985,189.43 $$$ 143,370.00 $ 56,070.00 $ 419,850.00 $ 2,703,341.25 $ 349,728.50 $ 592,628.50 $ 26,690,898.58UN UN UN UN UN UN UN UN UN$ 156,738.75 $ 59,686.25 $ 41,543.75 $ 111,061.25 $ 50,525.94 $ 53,892.50 $ 56,334.38 $ 178,963.75 $ 63,060.00$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ 156,738.75 $ 59,686.25 $ 41,543.75 $ 111,061.25 $ 50,525.94 $ 53,892.50 $ 56,334.38 $ 178,963.75 $ 63,060.00$$$$$$$$$-0.00 0.00 47.00 0.00 18.00 0.00 0.00 0.00 0.000.00 0.00 39.00 0.00 11.00 0.00 0.00 0.00 0.00$$$ 1,620,206.25 $$ 555,785.31 $$$$-0.00 0.00 47.00 0.00 18.00 0.00 0.00 0.00 0.00$$$ 1,952,556.25 $$ 909,466.88 $$$$-12.32 12.33 12.34 12.35 12.36 12.37 12.38 12.39 12.40 12.41 12.42 12.43 12.44 12.45 12.46 12.47 12.48 12.49 12.50 12.51 12.52 12.53 12.54 12.55 13 13.2 13.3 15 15.1Suministro e instalacin Tapa final ducto 100x50mm Suministro e instalacin Angulo Interno Variable ducto 100x50mm Suministro e instalacin Angulo Externo Variable ducto 100x50mm Suministro e instalacin Angulo plano para ducto 100x50mm Suministro e instalacin Unin de ductos 100x50mm Suministro e instalacin Sujetacables Suministro e instalacin salida toma corriente doble regulada tipo modular en ducto Suministro e instalacion cable de cobre aislado THWN No 10 awg Suministro e instalacin de gabinete pivotante 21 unidades, incluye: Dos (2) patch panel de 24 ptos,un (1) patch panel telefonico 2 hilos 1 female cat 3, Dos (2) organizadores doble tapa, cuarenta y uno (41) patch cord cat 3 1 m azul, veintitres (41) pat Suministro e instalacin cable UTP Cat 6 certificado Suministro e instalacin acometida electrica desde tablero de proteccion general hasta tablero de proteccion parcial en cable de cobre ( 4xNo.6 THHN + Alambre 1xNo.8 TW , en tubera PVC ) en interior de edificio. Suminstro e instalacin de interruptor termomagntico 3x70 A Suministro e instalacin acometida electrica desde tablero de proteccion general hasta tablero de proteccion parcial en cable de cobre ( 4xNo.8 AWG THHN + Alambre 1xNo.8 TW , en tubera PVC ) en interior de edificio. Excavacion y tapado de zanja Suministro e instalacion caja de inspeccin subterranea CS-274, incluye marco y tapa con refuerzo en hierro. Suministro e instalacin acometida electrica desde la subestacion electrica hasta tablero de proteccion general de bloque de las aulas en cable de cobre ( 4xNo.2/0 THHN + Alambre 1xNo.4 T desnudo, en tubera PVC ) Suministro e instalacin tablero de proteccion general compuesto por gabinete de acero inoxidable, para control de alumbrado; beaker totalizador 3x200 a tipo industrial, siete (7) beaker de proteccion ajustable 3x63 a tipo industrial; barrrajes para fase , neutro y tierra. Suministro e instalacion tuberia conduit PVC 3" Suministro e instalacion tuberia conduit PVC 2" Suministro e instalacion tuberia conduit PVC 1. 1/2" Suministro e insatalacio Lmpara de emergencia para 165 lmenes, 3 horas autonoma. Incluye: Difusor prismtico en acrlico traslcido y Etiqueta autoadhesiva verde con leyenda "SALIDA"ANP 16 Suministro e instalacin de placa de concreto para instalacin de unidad condensadora Suministro e instalacion tuberia conduit PVC 1" suministro e instalacion de salida para alumbrado interior a la vista en tuberia EMT de 1/2" incluye cable y accesorios de montaje ITEMS NO PREVISTOS ANDENES Suministro e instalacin Sardinel prefabricado tipo A10 (0,50*0,80*0,20) filtro en gravilla 1 1/2" Area: 0,60 m2 ITEMS NO PREVISTOS SISTEMA RED CONTRA INCENDIOS Incluye : Bomba principal de alta presion, Bomba jockey, Tablero de control Siemens, Ensamble de Bomba y equipo contraincendio, Instalacion y puesta en marcha de red contraincendio AJUSTE AL PESO OBSERVACION PARA LIQUIDACION FINAL DE OBRA : UNA VEZ REVISADAS LAS CANTIDADES FINALES PARA LA LIQUIDACION DE LA OBRA ,SE PROCEDIO A REALIZAR EL ACTA MODIFICATORIA No 5, DONDE QUEDAN REGISTRADAS LAS MAYORES Y MENORES CUANTIAS POR ITEM.UN UN UN UN UN UN UN ML UN ML ML UN ML M3 UN ML UN ML ML ML UN UN ML ML$ 4,525.00 $ 28,976.25 $ 27,232.50 $ 43,817.50 $ 11,518.75 $ 3,251.25 $ 38,812.50 $ 5,738.75 $ 12,499,628.75 $ 4,162.50 $ 20,223.75 $ 400,927.19 $ 20,223.75 $ 25,471.88 $ 454,415.63 $ 159,372.50 $ 6,057,767.73 $ 14,616.25 $ 11,322.50 $ 9,197.50 $ 413,821.25 $ 99,856.25 $ 8,446.88 $ 98,368.88$$$$$$$$$$$$$$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00$ 4,525.00 $ 28,976.25 $ 27,232.50 $ 43,817.50 $ 11,518.75 $ 3,251.25 $ 38,812.50 $ 5,738.75 $ 12,499,628.75 $ 4,162.50 $ 20,223.75 $ 400,927.19 $ 20,223.75 $ 25,471.88 $ 454,415.63 $ 159,372.50 $ 6,057,767.73 $ 14,616.25 $ 11,322.50 $ 9,197.50 $ 413,821.25 $ 99,856.25$$$$$$$$$$$$$$$$$$$$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.15 2.00 0.00 1.00 0.00 347.80 0.00 0.00 0.00 67.00 269.81 0.00$$$$$$$$$$$$$$ 334,955.16 $ 908,831.25 $$ 6,057,767.73 $$ 3,937,965.50 $$$$ 565,940.63 $ 26,540,906.16 $$$$-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -120.00 0.00 -75.00 5.15 2.00 0.00 -1.00 -75.00 -6.20 0.00 0.00 0.00 12.00 183.81$$$$$$$$$$$ -2,426,850.00 $$ -1,516,781.25 $ 131,180.16 $ 908,831.25 $$ -6,057,767.73 $ -1,096,218.75 $ -70,199.50 $$$$ 101,362.50 $ 18,081,182.91 $-0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.15 2.00 0.00 0.00 0.00 347.80 0.00 0.00 0.00 67.00 183.81$$$$$$$$$$$$$$ 334,955.16 $ 908,831.25 $$$$ 3,937,965.50 $$$$ 565,940.63 $ 18,081,182.91 $-ML ML$ 57,875.00 $ 90,920.00$$-0.00 0.00$ 57,875.00 $ 90,920.00$$-0.00 0.000.00 0.00$$$-0.00 0.00$$$-GL$ 85,687,606.88$-0.00$ 85,687,606.88$-0.00$$ 2,885.000.00$-0.00$-VR. ACTUAL. MOD. 5$ 2,648,929,512.00VR. PRESENTE ACTA$ 463,270,711.00VR. ACUM. LIQ. FINAL$ 2,632,944,388.00SALDO AFAVOR DEL MUNICIPIO. Para constancia de lo anterior firman la presente acta parcial, los que en ella intervinieron, en Aguazul, a los DOCE (12) DIAS DEL MES DE NOVIEMBRE DE 2008. OSCAR MAURICIO BUTRON GELVEZ. R/L UNIN TEMPORAL SAN AGUSTIN. NOTA: LAS CANTIDADES Y VALORES CONSIGNADOS EN LA PRESENTE ACTA SON RESPONSABILIDAD EXCLUSIVA DEL INTERVENTOR Y EL CONTRATISTA Original: Oficina Juridica 1era copia: Contratista 2da copia: Interventor 3era copia: Dependencia responsable del contrato ING. ANGELA PAOLA RIOS. Vo Bo SECRETARIA DE OBRAS PUBLICAS WILSON LOPEZ BOGOTA SERIARQ LTDA. INTERVENTOR$ 15,985,124.00UNION TEMPORAL SAN AGUSTINNIT. 900.089.820-0Carrera 9 No. 9 - 63. Telfono: (098) 6392645AGUAZUL - CASANAREFACTURA DE VENTA N 0006IVA REGIMEN COMUNRESOLUCION DIAN No. 040000093921 FECHA. 2007/09/10 DEL 0001 AL 0050CLIENTE: DIRECCIN: NIT./ C.C. No.MUNICIPIO DE AGUAZUL CARRERA 12 No. 10 - 36. TELEFONO: 639 2323 891.855.200 - 9 CIUDAD: AGUAZUL 26DIACONTRATO No. 117 - 06Fecha Factura:DESCRIPCION DEL SERVICIOVALOR$ COLACTA DE LIQUIDACION DE OBRA CONTRATO No. 117 - 06, para la CONSTRUCCION SEGUNDA ETAPA SEDE COLEGIO SAN AGUSTIN DEL MUNICIPIO DE AGUAZUL, DEPARTAMENTO DE CASANARE VALOR EJECUTADO PRESENTE ACTA AMORTIZACIN DEL ANTICIPO 50%$ 479,253,356.00$ 239,626,678.00CONFORMACION UNION TEMPORAL: BUILDING LTDA ELCO LTDA 90% 10%DOSCIENTOS TREINTA Y NUEVE MILLONES SEISCIENTOS VENTISEIS MIL SEISCIENTOS SETENTA Y OCHO PESOS, MCTE CON O0/100No somos Autorrtenedores No somos grandes ContribuyentesSUB-TOTAL I.V.A TOTAL$ 239,626,678.00 $ 239,626,678.00Artculo 774 del"Esta Factura se asimila en todos sus efectos legales a una letra de cambio, Cdigo de Comercio."FORMA DE PAGO:Elaborado por: Aprobado por:FECHA DE VENCIMIENTORecib a satisfaccin,DIAFIRMA AUTORIZADAC.C NoFACTURA DE VENTA N 0006IVA REGIMEN COMUNRESOLUCION DIAN No. 040000093921 FECHA. 2007/09/10 DEL 0001 AL 00509MES2008AOVALOR$ COL$ 479,253,356.00$ 239,626,678.00$ 239,626,678.00 $ 239,626,678.00Artculo 774 delra de cambio,MESAOTORIZADADEREPUBLICA DE COLOMBIA DEPARTAMENTO DE CASANARE MUNICIPIO DE AGUAZUL SECRETARIA DE OBRAS PUBLICAS.Hoja No. 1 23 SEPT DD MMde 3 2008 AACONTRATO DE OBRA No. 117 DE 2006ACTA No.CONTRATO No. VIGENCIA OBJETO DEL CONTRATO :(Indique el objeto del contrato de ejecucin suscrito)01117 DEDE RECIBO FINAL DE CONTRATO DE OBRA2006(Ao de suscripcin)(Nmero de contrato)Cinco (5) meses mas contados a partir del vencimiento del plazo.( Indique la vigencia del contrato suscrito especificando das y meses segn sea necesario)EL CONTRATISTA SE OBLIGA PARA CON EL MUNICIPIO A REALIZAR POR EL SISTEMA DE PRECIOS UNITARIOS SIN FORMULA DE REAJUSTE LA CONSTRUCCION SEGUNDA ETAPA SEDE COLEGIO SAN AGUSTIN DEL MUNICIPIO DE AGUAZUL, DEPARTAMENTO DE CASANARE.LOCALIZACION DEL PROYECTOPREDIO SEDE NUEVA COLEGIO SAN AGUSTIN. AREA URBANA MUNICIPIO DE AGUAZUL.(Indique el sitio de ejecucin del contrato)PLAZO DE EJECUCION INICIAL DEL CONTRATO FECHA DE INICIACION DEL CONTRATO FECHA DE TERMINACION DEL CONTRATO PRORROGAS CONTRATO ADICIONAL No. ADICIONAL EN VALOR Y EN PLAZO No 001 ADICIONAL EN PLAZO N001 2(Da)UN (01) AO(Indique el nmero de das o de meses para ejecutar el contrato)DE DEAGOSTO(Mes)DE DE2006(Ao)1(Da)AGOSTO(Mes)2007(Ao)FECHA 18 de July de 2007 4 de April de 2008SI $ NO TIEMPO (DIAS, MESES) 60 DIAS 60 DIASSUSPENSIONES Y AMPLIACIONES DE SUSPENSION ACTAS No. SUSPENSION 1 MEDIANTE ACTA No 2 AMPLIACIN SUSPENSIN 1 MEDIANTE ACTA No 3 SUSPENSION 2 MEDIANTE ACTA No 5SI TIEMPO (DIAS, MESES) 30 DIAS 90 DIAS 65 DIAS$NOFECHA DE TERMINACION ACTUAL DEL CONTRATO VALOR INICIAL DEL CONTRATO5(Da)DEJUNIO(Mes)DE2008(Ao)$ 1,799,865,952.00(Indique el valor inicial del contrato en nmeros)VALOR ADICIONES CONTRATO ADICIONAL No. ADICIONAL EN VALOR Y PLAZO No 001 FECHA JULIO 18 DE 2007SI$NOVALOR ( $ ) $ 849,063,560.00VALOR ACTUAL DEL CONTRATO$ 2,648,929,512.00(Indique el valor actual del contrato en nmeros)FORMATO MA-C-11REPUBLICA DE COLOMBIA DEPARTAMENTO DE CASANARE MUNICIPIO DE AGUAZUL SECRETARIA DE OBRAS PUBLICAS. CONTRATISTA INTERVENTOR SUPERVISOR(Escriba el nombre del funcionario designado para sel el Supervidor del contrato)Hoja No. 2 23 SEPT DD MMde 3 2008 AACONTRATO DE OBRA No. 117 DE 2006UNION TEMPORAL SAN AGUSTIN R/L OSCAR MAURICIO BUTRON GELVEZ.(Escriba el nombre o razn social del contratista)SERVICIOS DE INGENIERIA Y ARQUITECTURA - SERIARQ LTDA. R/L WILSON LOPEZ BOGOTA.(Escriba el nombre o razn social del Interventir del contrato)En Aguazul; a losVEINTITRES(23)dias del mes deSEPTIEMBREde2008(Indique el da, mes y ao en que se efecta la reunin)se reunieronOSCAR BUTRON GELVEZ R/L UNIN TEMPORAL SAN AGUSTIN(Nombre del representante legal o delegado de la firma contratista), en su calidad de contratistaWILSON LOPEZ BOGOTA R/L SERIARQ LTDA(Nombre del representante legal o delegado de la firma contratista), en su calidad de interventor, con el fin deconstatar el estado de las obras objeto del contrato anteriormente citado, hacer entrega de dicho objeto por parte del Contratista y recibir a satisfaccin por parte de la interventoria las obras ejecutadas. Dichas obras fueron terminadas el da 23 de SEPTIEMBRE de 2008 , segn el Acta No. 01(Da) (Mes) (Ao) (No. Acta de Terminacin de Obra)de terminacion de Contrato de obra. A. OBRA EJECUTADA (Se anexa presupuesto) VALOR EJECUTADO DEL CONTRATO $ 2,632,944,388.00(Indique el valor ejecutado del contrato en nmeros)OBSERVACIONES DE LA INTERVENTORIA SOBRE EL ACABADO A LAS OBRAS EJECUTADAS :B. ACTAS DE RECIBO PARCIAL DE OBRALa interventora present y fueron tramitadas a la ejecucin del contranto en mencin de 2008 ,por un valor total de5(Nmero de actas), actas de recibo parcial de obra correspondientesde 2006(Ao en que inici la ejecucin)AGOSTO(Mes en que inici ejecucin)aMAYO(Mes en que termina ejecucin)de$ 2,169,676,156.00 por obra ejecutada.(Valor total en nmeros de las actas de recibo parcial suscritas)(Ao en que termina la ejecucin)C. POLIZA DE ESTABILIDADEl contratista present el correspondiente certificado de modificacion del amparo de estabilidad de las obras ejecutadas, el cual se anexa y forma parte integral de la presente acta, as:COMPAA POLIZA O CERT MODIFICA No. RIESGOCumplimiento Anticipo.V/R. ASEGURADO $ 264,892,951.20 $ 1,324,464,756.00 $ 132,446,476.00 $ 1,324,464,756.00 $ 264,892,951.20VIGENCIA DESDE 6/5/2008 6/5/2008 6/5/2008 6/5/2008 4/4/2008 HASTA 12/5/2008 12/5/2008 6/5/2011 6/5/2013 6/8/2011CONFIANZA18 GU017059Prestaciones Sociales Estabilidad RESPONSABILIDAD CIVILFORMATO MA-C-11REPUBLICA DE COLOMBIA DEPARTAMENTO DE CASANARE MUNICIPIO DE AGUAZUL SECRETARIA DE OBRAS PUBLICAS. D. ESTADO GENERAL DE LAS OBRASHoja No. 3 23 SEPT DD MMde20083 AACONTRATO DE OBRA No. 117 DE 2006Una vez realizada la inspeccin total de la obra, se constat que a la fecha de2008(Ao)23(Da)deSEPTIEMBRE(Mes)los trabajos terminados se encuentran ejecutados a entera satisfaccin de acuerdo con loestablecido en el contrato. En concecuencia, el Contratista hace entrega real y efectiva de la obra ejecutada a la interventoria y esta la recibe. El recibo de los trabajos terminados, no releva al Contratista de sus responsabilidades y obligaciones a las cuales hace referencia el contrato y las normas legales vigentes. El contratista se compromete a mantener vigentes las garantias presentadas, de conformidad con lo establecido en el contrato. NOTA: Las obras que presentan observaciones por parte de la interventoria estan relacionadas en esta acta y se tendrn en cuenta para la liquidacin del contrato de acuerdo con la clusula No. DECIMO PRIMERA.(Indique el nmero de la clusula del contrato que establece la retencin de la garanta adicional por incumplimiento del contratista a las observaciones del interventor a las obras ejecutadas)Para constancia de lo anterior, firman la presente acta los que en ella intervinieron a los del mes deSEPTIEMBRE(Mes en que se firma el acta)23(Da)dasde2008(Ao de finalizacin)Firma NombreUNIN TEMPORAL SAN AGUSTIN. R/L OSCAR MAURICIO BUTRON GELVEZContratistaFirma NombreSERVICIOS DE INGENIERIA Y ARQUITECTURA SERIARQ LTDA. R/L WILSON LOPEZ BOGOTA.InterventorOriginal Oficina Juridica 1era Copia Interventor 2da Copia Contratista 3ra Copia Dependencia responsable del contratoFORMATO MA-C-11REPUBLICA DE COLOMBIA DEPARTAMENTO DE CASANARE MUNICIPIO DE AGUAZUL SECRETARIA DE OBRAS PUBLICASHoja No. 12 DD1 11 MMde4 2008 AACONTRATO DE OBRA No. 117 DE 2006ACTA No.GRADO DE RESPONSABILIDAD01DE LIQUIDACION DE CONTRATO DE OBRA1) Mediante la suscripcin de la presente acta de liquidacin, el Contratista, Interventor y Supervisor, asumen plena responsabilidad por la veracidad de la informacin en ella contenida, y en esa medida deben garantizar el cumplimiento de todas y cada una de las obligaciones contractuales de las dos partes (Artculo 60 Ley 80 de 1993) 2) En el evento de que se pacten reconocimientos (punto 6 de esta acta) el pago de los mismos solo ser procedente cuando se haya demostrado plenamente que en la ejecucin del contrato se presentaron circunstancias o hechos especiales, generadores de costos adicionales que deben ser cancelados al contratista. El Interventor, supervisor y contratista, sern plenamente responsables por los reconociminetos pactados. 3) El Secretario responsable del contrato o proyecto revisar que la informacin incluida en el acta sea correcta y como prueba de ello colocar su Visto Bueno. Su responsabilidad se limita a garantizar que el contrato se liquide previa aprobacin del Interventor, del Contratista y revisin de las condiciones para su liquidacin por parte del supervisor de contrato. CONTRATO No. 117(Nmero de contrato)DE21-Jun-08(Ao de suscripcin)LICITACION PUBLICA CONTRATACION DIRECTAOBJETO DEL CONTRATO :(Indique el objeto del contrato de ejecucin suscrito)$CONCURSO DE MERITOS AMA-LPSPO-012-06(Identifique la licitacin pblica o contratacin directa efectuada)EL CONTRATISTA SE OBLIGA PARA CON EL MUNICIPIO A REALIZAR POR EL SISTEMA DE PRECIOS UNITARIOS SIN FORMULA DE REAJUSTE LA CONSTRUCCION SEGUNDA ETAPA SEDE COLEGIO SAN AGUSTIN DEL MUNICIPIO DE AGUAZUL, DEPARTAMENTO DE CASANARE.PREDIO SEDE NUEVA COLEGIO SAN AGUSTIN. AREA URBANA MUNICIPIO DE AGUAZUL. LOCALIZACION DEL PROYECTO(Indique el sitio de ejecucin del contrato)PLAZO DE EJECUCION INICIAL DEL CONTRATO FECHA DE INICIACION DEL CONTRATO FECHA DE TERMINACION DEL CONTRATO 2(Da)UN (01) AO(Indique el nmero de das o de meses para ejecutar el contrato)DE DEAGOSTO(Mes)DE DE2006(Ao)1(Da)AGOSTO(Mes)2007(Ao)En Aguazul; a losDOCE(12)dias del mes deNOVIEMBREde2008(Indique el da, mes y ao en que se efecta la reunin)se reunieronOSCAR MAURICIO BUTRON GELVEZ R/L UNIN TEMPORAL SAN AGUSTIN(Nombre del representante legal o delegado de la firma contratista), en su calidad de contratista , en su calidad deWILSON LOPEZ BOGOTA R/L SERVICIOS DE INGENIERIA Y ARQUITRECTURA - SERIARQ LTDA(Nombre del representante legal o delegado de la firma contratista)interventor, con el fin de liquidar el contrato anteriormente citado cuyas obras ejecutadas y terminadas fueron entregadas por el Contratista y recibidas por la interventora el da descritas en el acta No.01 23 de SEPTIEMBRE de 2008(Indique da, mes y ao en que la Interventora recibi las obras)de recibo final de obra, la cual es parte integral de la presente acta.FORMATO MA-C-13REPUBLICA DE COLOMBIA DEPARTAMENTO DE CASANARE MUNICIPIO DE AGUAZUL SECRETARIA DE OBRAS PUBLICASHoja No. 12 DD2 11 MMde4 2008 AACONTRATO DE OBRA No. 117 DE 2006A. ESTADO FINANCIERO 1, Datos GeneralesValor Inicial del Contrato Valor Adiciones Valor del Contrato mas adiciones Valor Obra ejecutada $ 1,799,865,952.00 $ 849,063,560.00 $ 2,648,929,512.00 $ 2,632,944,388.00 Valor Obra mas ajustes Valor Anticipo Valor Anticipo Amortizado Valor anticipo por amortizar Valor Ajustes $ 1,324,464,756.00 $ 1,084,838,077.00 $ 239,626,679.00 $-$ 2.Ordenes de Pago SI NO Los valores de la obra ejecutada y sus respectivos ajustes, se relacionan en el siguiente cuadro, el cual incluye la amortizacin del anticipo.ACTA No.12 3 4 5MES EJECUCIONJULIO SEPTIEMBRE OCTUBRE ENERO MARZOORDEN DE PAGO No.3 4 5 6 7FECHA26 de September de 2007 19 de November de 2007 18 de December de 2007 19 de March de 2008 9 de May de 2008VALOR OBRA$ 536,107,100.00 $ 578,711,341.00 $ 437,750,522.00 $ 479,654,668.00 $ 137,452,525.00ANTICIPO AMORTIZADO SALDO$ 268,053,550.00 $ 289,355,670.00 $ 218,875,261.00 $ 239,827,334.00 $ 68,726,262.00 $ 1,056,411,206.00 $ 767,055,536.00 $ 548,180,275.00 $ 308,352,941.00 $ 239,626,679.003. Reservas presupuestales. Las reservas presupuestales que amparan las obras ejecutadas y los ajustes causados son los siguientes:No.2006000486 2007000724FECHA6/23/2006 7/19/2007CODIGORUBRO302020101020401 302020101020401VALOR$ 1,799,865,952.00 $ 849,063,560.00B. ESTADO LEGAL 1. ActasACTA No.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21ACTA ACTA ACTA ACTA ACTA ACTA ACTA ACTA ACTA ACTA ACTA ACTA ACTA ACTA ACTA ACTA ACTA ACTA ACTA ACTA ACTADE INICIO. No 2 DE SUSPENSIN / AMPLIACIN DE SUSPENSIN DE DESEMBOLSO DE ANTICIPO No 1 No 3 DE SUSPENSIN / AMPLIACIN DE SUSPENSIN No 4 DE REINICIO. DE FIJACIN DE PRECIOS NO PREVISTOS MODIFICATORIA No 1 MODIFICATORIA No 2 DE RECIBO PARCIAL DE OBRA No 1 MODIFICATORIA No 3 DE RECIBO PARCIAL DE OBRA No 2 DE RECIBO PARCIAL DE OBRA No 3 DE FIJACIN DE PRECIOS NO PREVISTOS MODIFICATORIA No 4 No 5 DE SUSPENSIN. No 6 DE REINICIO. DE RECIBO PARCIAL DE OBRA No 4 SOLICITUD DE PRORROGA. DE RECIBO PARCIAL DE OBRA No 5 MODIFICATORIA No 5 DE TERMINACIN DE CONTRATO DE OBRA.OBJETO8/2/2006 8/18/2006 9/15/2006 9/18/2006 12/17/2006 2/15/2007 2/20/2007 8/23/2007 9/26/2007 10/22/2007 11/19/2007 12/18/2007 12/19/2007 12/21/2007 12/26/2007 2/29/2008 3/19/2008 4/4/2008 5/9/2008 5/16/2008 6/5/2008SI$FECHA2. Contratos Adicionales, Otro S y Modificaciones ContractualesDESCRIPCION DEL DOCUMENTOCONTRATO MODIFICATORIO ADICIONAL EN VALOR Y PLAZO No 1 ADICIONAL EN PLAZO No 001NO FECHA1/31/2007 7/18/2007 4/4/2008No.1 2 3OBJETOMODIFICACIN PRESUPUESTO DE OBRA ADICIN EN PLAZO Y VALOR ADICIN EN PLAZO DOS (2) MESESFORMATO MA-C-13REPUBLICA DE COLOMBIA DEPARTAMENTO DE CASANARE MUNICIPIO DE AGUAZUL SECRETARIA DE OBRAS PUBLICASHoja No. 12 DD3 11 MMde4 2008 AACONTRATO DE OBRA No. 117 DE 20063. Acciones Legales en ProcesoCLASE ETAPA PROCESAL FECHASIDESPACHONO$No. EXPEDIENTE4. SancionesSINO$Durante la ejecucin y desarrollo del mencionado contrato, se sancion y mult al Contratista mediante la(s) resolucion(es) No. y mediante resolucion(es) No. se resolvi el (los) recurso(s) de presentado(s) por el contratista por el valor de m/cte. Del valor anterior se descuenta la suma de del 2% de la retencin realizada al contratista y el valor restante lo cancel segn recibo No. 5. GarantiasCOMPAA POLIZA O CERT MODIFICA No. RIESGOCUMPLIMIENTO. BUEN MANEJO DEL ANTICIPO.delV/R. ASEGURADO $ 264,892,951.20 $ 1,324,464,756.00 $ 132,446,476.00 $ 1,324,464,756.00 $ 264,892,951.20VIGENCIA DESDE 6/5/2008 6/5/2008 6/5/2008 6/5/2008 4/4/2008 HASTA 12/5/2008 12/5/2008 6/5/2011 6/5/2013 6/8/2011CONFIANZA18 GU017059SALARIOS Y PRESTAC SOCIALES. ESTABILIDAD DE LA OBRA. RESPONSABILIDAD CIVIL6. Recibo de las Empresas Servicios Pblicos ( cuando aplique) EMPRESA ACTA No. FECHASINOOBSERVACIONESEn caso de no obtener respuesta por parte de las empresas debe dejarse la siguiente Nota: Transcurrido un (1) mes a partir de la solicitud, de conformidad con el Decreto 0573/84, las empresas que no han cumplido con la entrega de los paz y salvos, dan por recibidas las redes de servicios a entera satisfaccin y efectuaran el respectivo pago a favor del MUNICIPIIO, sin lugar a que haya reclamo por parte de las mismas. 6. Reconocimientos (mayores cantidades de obra, ecuacion contractual etc) En la presente acta se efectuarn SI NO Xlos reconocimientos a los que dio lugar suejecucin, con fundamento en los incisos 1 y 2 del artculo 60 de la Ley 80 de 1993 y en las causas tcnicas que a continuacin se consignan debidamente sustentadas y justificadas por el contratista e interventor y revisadas por el coordinador de obra: Fundamento TcnicoValor del reconocimiento :(nmeros y letras)$-SON:Valor total del contrato :(nmeros y letras)$-SON:FORMATO MA-C-13REPUBLICA DE COLOMBIA DEPARTAMENTO DE CASANARE MUNICIPIO DE AGUAZUL SECRETARIA AREA DE PLANEACION Y OBRAS PUBLICASHoja No. 12 DD4 11 MM NOde4 2008 AACONTRATO DE OBRA No. 117 DE 20067. Cartilla de Conservacin o recomendaciones SI $ Se anexa la Cartilla de Conservacin o recomendaciones de las obras ejecutadas en desarrollo del contrato en referencia, entregada por el contratista mediante oficio No. COL-SA-070Nmero de oficio remisorioEl recibo de las obras relacionadas en el Acta No. 01 y la liquidacion del contrato no releva al contratista de sus responsabilidades y obligaciones de acuerdo con las normas legales vigentes. C- BALANCE FINANCIERO DEL CONTRATO (DEBE ACONDICIONARSE DE ACUERDO A LAS CIRCUNSTANCIAS)CONCEPTO VALOR INICIAL DEL CONTRATO VALOR ADICIONES VALOR AJUSTES VALOR MAYOR CANTIDAD RESTABLECIMIENTO ECUACION CONTRACTUAL VALOR RETENCIONES EFECTUADAS VALOR OBRA EJECUTADA VALOR NO EJECUTADO VALOR SANCIONES VALOR ACTA PARCIAL No. 01 VALOR AMORTIZADO ACTA PARCIAL No. 01 VALOR PAGADO ACTA PARCIAL No. 01 VALOR ACTA PARCIAL No. 02 VALOR AMORTIZADO ACTA PARCIAL No. 02 VALOR PAGADO ACTA PARCIAL No. 02 VALOR ACTA PARCIAL No. 03 VALOR AMORTIZADO ACTA PARCIAL No. 03 VALOR PAGADO ACTA PARCIAL No. 03 VALOR ACTA PARCIAL No. 04 VALOR AMORTIZADO ACTA PARCIAL No. 04 VALOR PAGADO ACTA PARCIAL No. 04 VALOR ACTA PARCIAL No. 05 VALOR AMORTIZADO ACTA PARCIAL No. 05 VALOR PAGADO ACTA PARCIAL No. 05 VALOR EJECUTADO A PAGAR VALOR ANTICIPO A AMORTIZAR VALOR A PAGAR PRESENTE ACTA SALDO A FAVOR DEL MUNICIPIO VALOR OTROS DESCUENTOS (ESPECIFICAR) TOTALES VALOR CONTRATO $ 1,799,865,952.00 $ 849,063,560.00 VALOR EJECUTADO VALOR ORDEN DE PAGO$ 2,632,944,388.00 $ 15,982,623.00 $ 536,107,100.00 $ 268,053,550.00 $ 268,053,550.00 $ 578,711,341.00 $ 289,355,670.00 $ 289,355,671.00 $ 437,750,522.00 $ 218,875,261.00 $ 218,875,261.00 $ 479,654,668.00 $ 239,827,334.00 $ 239,827,334.00 $ 137,452,525.00 $ 68,726,262.00 $ 68,726,263.00 $ 463,270,734.00 $ 239,626,679.00 $ 223,644,055.00 $ 15,982,623.00 $ 2,648,929,512.00 $ 2,632,946,890.00 $ 2,632,946,890.00 $ 223,644,055.00VALOR PENDIENTE DE PAGO AL CONTRATISTANOTA:El valor pendiente de pago al contratista corresponde a:Cantidades de Obra Ejecutada.$ 223,644,055.00por concepto deCon la firma de la presente Acta, el contratista manifiesta que el Municipio de Aguazul cumpli con cada una de las obligaciones adquiridas con la suscripcin del Contrato de referencia; as mismo manifiesta que renuncia a cualquier reclamo posterior, declarndose las partes a PAZ Y SALVO. Para constancia de lo anterior, firman la presente acta los que en ella intervinieron a los del mes deNOVIEMBRE(Mes en que se firma el acta)12(Da)dasde2008(Ao de finalizacin)Firma NombreOSCAR BUTRON GELVEZ R/L UNIN TEMPORAL SAN AGUSTIN.ContratistaWILSON LOPEZ BOGOTA R/L SERIARQ LTDA.InterventorING. ANGELA PAOLA RIOS ROSASSecretario Dependencia ResponsableOriginal Oficina Juridica 1era Copia Interventor 2da Copia Contratista 3ra Copia Dependencia responsable del contratoFORMATO MA-C-1315982623